Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Meeting papers

of 134

Page text shows just the words. Original shows the document exactly as it was published.

             Noosa Shire Council Subordinate Local Law No. 1 (Administration) 2015          20



Schedule 9              Establishment or occupation of a temporary
                        home
                                                                                        Section 11


1   Prescribed activity
         Establishment or occupation of a temporary home.


2   Activities that do not require approval under the authorising local law
         The occupation of a temporary home on rural land for a maximum period of four weeks,
         provided the occupation complies with section 6(1)(c) & (d) and the temporary home is
         on land owned by the occupier.


3   Documents and materials that must accompany applications for approval
         An application for approval must be accompanied by –
           (a)   the name, address, telephone number and email address of the applicant and
                 person to whom the temporary home application relates; and
           (b)   if applicable, the trading name, address, telephone number and email address of
                 the business under which the temporary homes approval is to be issued; and
           (c)   details of the application -
                 (i)     the purpose for which the application is required; and
                 (ii)    the number of occupants, adults and children, to be normally
                         accommodated; and
                 (iii) toilet, bathing, laundry, water storage and refuse facilities; and
                 (iv) a drawing showing the design and dimensions of the proposed temporary
                      home; and
           (d)   the materials out of which the temporary home is to be constructed and other
                 structural details of the temporary home; and
           (e)   the location of the temporary home; and
           (f)   in the case of a residential caretaker, details of a current building approval for
                 the construction of the permanent residence and evidence of financial capacity
                 and ability to construct the permanent residence; and
           (g)   in the case of a site caretaker, demonstration of the need for a site caretaker;
                 and
           (h)   if the applicant is not the owner of the land on which the establishment of the
                 temporary home is to be located – the written consent of the owner.
           (i)   the applicable fee as determined by the local government’s schedule of fees
                 and charges.




                                                                                             Page 50 of 134
Log in to download the original file

4a11a09c9a.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.