MCU14/0076
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Sheet 1 Site Plan, prepared by Dwyer Quality Homes 30.7.14
Sheet 2 Ground Floor Plan, prepared by Dwyer Quality 30.7.14
Homes
Sheet 3 Upper Floor Plan, prepared by Dwyer Quality 30.7.14
Homes
Sheet 4 Elevations, prepared by Dwyer Quality Homes 30.7.14
Sheet 5 Elevation, prepared by Dwyer Quality Homes 30.7.14
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface and 2 storeys.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the building does not exceed the maximum height requirement of this Decision
Notice.
Setbacks
5. The pool must be setback a minimum of 2 metres from the eastern (seaward)
boundary and a minimum of 1 metre from the side boundaries.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $2000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Building Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions
of approval less any costs incurred by Council in respect of enforcing performance
of this permit. Council reserves the right to call upon the bond or guaranteed sum
to effect compliance with conditions.
Landscaping
7. Existing trees within road reserve must be retained.
8. Dense vegetation must be planted between the pool and eastern boundary for the
full length of the pool in accordance with Council’s Planning Scheme Policy PSP3
Landscaping Plants and Guidelines. The planted vegetation must consist of
native, endemic species.
Earthworks
9. Earthworks required on site must be carried out in accordance with Council’s
Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause
the additional ponding of water on any adjoining lands or concentrate or direct
overland flow on to an adjoining property.
Page 2 of 6
Document Set ID: 19818156
Version: 1, Version Date: 02/11/2014 Print Date: 12 November 2019, 8:41 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
existing approval mcu140076.pdfRelated documentApplication case desk ↗
About this file
- File size
- 709 KB (small file)
- File type
No other editions are linked here.