Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

            Non Compliant Business inSmash
                                      Noosaville
                                           Repairs/
                                                    Industrial Area
                        Concrete Batching            Paint
                               10%                    3%        Wood Production
              Landscape Supplies                                     10%
                     3%
                 Aquaculture
                     3%                                                  Vehicle Storage
                                                                               7%

                                                                                Plastic
                                                                             Manufacturing
                                                                                  7%


                                                                             Printers
                                                                                6%

                                                                         Metal Fabrication
                                                                                3%

                     Motor Vehicle
                      Workshop
                         48%

Chart 2 Pie Chart showing a breakdown of the non-compliant business in the Industrial area


3.3.2    Noosaville, Noosa and Tewantin (outside the Rene St Industrial area)
Inspection summary
 44 premises inspected
 25 premises non-compliant-57%
 19 premises compliant-43%

Summary of issues
 1 Engineering
 1 Wood Production
  o Provide bund across paint room
 1 Plastic Manufacturing
 2 Smash repair / Spray painting
 2 Pick up Litter and clear stormwater drain
  o Provide bund across paint room
 5 Marine repair
  o Provide booms to contain spillage in river.
 3 maintain litter and waste on site
  o Maintain separators
 2 maintain bund to outdoor oil storage area
 2 clear stormwater drain
  o Remove oil soak tree stump and ground material
  o Dispose of old damaged oil drums


Investigation into Stormwater Pollution from Noosa’s Industrial Activities                   Page 12
Log in to download the original file

2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities(PDF, 4MB).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.