Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Non Compliant Business inSmash
Noosaville
Repairs/
Industrial Area
Concrete Batching Paint
10% 3% Wood Production
Landscape Supplies 10%
3%
Aquaculture
3% Vehicle Storage
7%
Plastic
Manufacturing
7%
Printers
6%
Metal Fabrication
3%
Motor Vehicle
Workshop
48%
Chart 2 Pie Chart showing a breakdown of the non-compliant business in the Industrial area
3.3.2 Noosaville, Noosa and Tewantin (outside the Rene St Industrial area)
Inspection summary
44 premises inspected
25 premises non-compliant-57%
19 premises compliant-43%
Summary of issues
1 Engineering
1 Wood Production
o Provide bund across paint room
1 Plastic Manufacturing
2 Smash repair / Spray painting
2 Pick up Litter and clear stormwater drain
o Provide bund across paint room
5 Marine repair
o Provide booms to contain spillage in river.
3 maintain litter and waste on site
o Maintain separators
2 maintain bund to outdoor oil storage area
2 clear stormwater drain
o Remove oil soak tree stump and ground material
o Dispose of old damaged oil drums
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.