2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

 15. Photo taken 21/03/17 stormwater 2 after 16. Photo taken 21/03/17 stormwater after a
 a week of reasonable rains                  week of reasonable rains


Table 1: Summary of mean measurements collected at stormwater outlets and receiving
waters of Eenie Creek in June and July 2016.

                                   Eenie Creek      Stormwater     Eenie Creek       Stormwater   Eenie Creek
                                      Site 1-         Outlet 1        Site 2           Outlet 2      Site 3
                                   Upstream of
                                       the
                                   stormwater
                                      drains
 pH (pH units)                              5.46            7.18              5.82         6.61          6.31
 Water Temp. (C0)                         16.09             16.8             16.64        19.28         17.92
 Elec. Conduct. (uS/cm)                     0.12            0.26              2.11         9.51         10.47
 Dissolved O2 (% Saturation)                36.8           47.58             38.47        62.18         38.23
 Turbidity (NTU)                            2.65           13.92              5.61        44.65          8.64
 Lead (mg/L)                              0.001            0.001             0.001        0.001         0.001
 Total Nitrogen (mg/L)                      0.46            0.47              0.48         2.63            0.6
 Total Phosphorus (mg/L)                    0.03            0.05              0.02         0.21          0.02
 Total Suspended Solid (mg/L)                  2               2                 5         8.67              3
 TPH C6 - C9 (ug/L)                         <50              <50               <50          <50           <50
 THP C10 - C14 (ug/L)                       <50              <50               <50        93.33           <50
 THP C15 – C28 (ug/L)                       <50              120               110      2243.33           <50
 TPH C29 – C36 (ug/L)                       <50              <50               <50       926.67           <50


2.4      Recommendations from initial survey
The officer performing the initial investigation recommended that an investigation should follow up
on the results of the stormwater pollution in the Noosaville Industrial Estate and:
 Further identify any contributing factors of local industries impact to the pollution and
    contamination of Noosa’s Waterways with heavy metals and Hydrocarbons.
 Determine the source of hydrocarbons by initially inspecting sites within the Noosaville Industrial
    area that were previously required to hold an ERA license and determine their potential to effect
    of stormwater runoff polluting Eenie Creek.



Investigation into Stormwater Pollution from Noosa’s Industrial Activities                             Page 8
Log in to download the original file

2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities(PDF, 4MB).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.