Original source · versioned page text
L01 Statement to NSC
4.2 Overlay Codes
The site is mapped as being located in a Coastal Protection and Scenic Amenity Area. A review of the
proposal against the Coastal Protection and Scenic Amenity Code is detailed below:
Performance Outcomes Acceptable Outcomes Proposal
PO1
Development allows for natural No acceptable outcome Complies – building setback from seaward boundary and is
fluctuations of the coast and provided. outside mapped erosion prone area
foreshores to occur, including
allowance of climate change.
PO2
Development is located, No acceptable outcome Complies – building setback away from seaward boundary.
designed and constructed to:
provided Existing vegetation are rear of site to be retained.
a) maintain dune crest
heights and minimise and
mitigate the risk to
development from wave
overtopping and storm
tide inundation; and
b) maintain or enhance
coastal ecosystems and
natural features such as
coastal creeks and
marine plants including
mangroves, salt marshes
and coastal wetlands, to
assist in protecting and
buffering communities
and infrastructure from
sea-level rise and coastal
inundation impacts.
PO3
Where a coastal building line No acceptable outcome Design includes two cantilevered 3.0m wide decks. The upper
exists on a lot, all buildings,
structures and retaining walls provided level deck is covered to provide weather protection due to the
do not extend seaward of the exposed site conditions. The covering of the deck is considered
coastal building line for the site, essential due to the south-easterly orientation and impacts of
other than— weather on the deck. Covering of the deck will enable the
windows and doors to be opened which allows for natural cross
a) uncovered and
unenclosed cantilevered ventilation.
balconies that do not
extend greater than 3 It is also noted that there are several surrounding dwellings that
metres seaward of the have covered decks within the 15 metre setback.
coastal building line; and
b) are setback a minimum
of 6 metres from the
seaward boundary
(see Figure 8.2.4.4).
PO4
Where a coastal building line No acceptable outcome Not applicable
does not exist on a lot
fronting the beachfront or a provided
reserve adjoining the
beachfront, new buildings
and structures
are setback no less than 6
metres from the seaward
Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.