4 February 2022                                                                               Project No. 21505-001-Rev0


Dean & Vanessa McDonald
Email: [email protected]



SLOPE STABILITY ASSESSMENT FOR PROPOSED SHED
315 OLD CEYLON ROAD, RIDGEWOOD


Dear Dean & Vanessa

1.0     INTRODUCTION
As requested, Tectonic has undertaken a slope stability assessment for a proposed shed at
315 Old Ceylon Road, Ridgewood. This report presents the results of our slope stability assessment,
together with geotechnical advice for the development. In summary, subject to implementation of the
recommendations made herein, there would be a Low Risk of slope instability affecting the proposed
development in accordance with the Australian Geomechanics Society Guidelines for Landslide Risk
Management, dated March 2007 (AGS 2007).

1.1    Details of Site and Development

The property is described as Lot 5 on RP802272, covers an area of 22.37 ha and is located within the Noosa
Council (NC) area. The proposed shed site was located in the southern part of the allotment, below Old
Ceylon Road which generally follows a southerly falling ridgeline. The allotment was densely vegetated and
generally fell in a southerly direction with a north/south gully bisecting the allotment. Rural residential
properties surrounded the site. Text Figure 1 below illustrates the site layout and the proposed development
area. A detailed description of the site is given in Section 2.




                                                                Proposed Shed
                                                                    Location




Text Figure 1: Aerial image of the site, courtesy Nearmap 15 May 2021


                                                   Tectonic Geotechnical Pty Ltd
                                                   PO Box 899, Buderim, QLD 4556
                                       Office: 07 5478 9016 Email: [email protected]
                                                       www.tectonicgeo.com.au
                                                        A.B.N. 83 165 727 828


[OCR of page images]
tecténic

geotechnical & environmental engineers

 

4 February 2022 Project No. 21505-001-RevO

Dean & Vanessa McDonald
Email: [email protected]

SLOPE STABILITY ASSESSMENT FOR PROPOSED SHED
315 OLD CEYLON ROAD, RIDGEWOOD

Dear Dean & Vanessa

1.0 INTRODUCTION

As requested, Tectonic has undertaken a slope stability assessment for a proposed shed at

315 Old Ceylon Road, Ridgewood. This report presents the results of our slope stability assessment,
together with geotechnical advice for the development. In summary, subject to implementation of the
recommendations made herein, there would be a Low Risk of slope instability affecting the proposed
development in accordance with the Australian Geomechanics Society Guidelines for Landslide Risk
Management, dated March 2007 (AGS 2007).

1.1 Details of Site and Development

The property is described as Lot 5 on RP802272, covers an area of 22.37 ha and is located within the Noosa
Council (NC) area. The proposed shed site was located in the southern part of the allotment, below Old
Ceylon Road which generally follows a southerly falling ridgeline. The allotment was densely vegetated and
generally fell in a southerly direction with a north/south gully bisecting the allotment. Rural residential
properties surrounded the site. Text Figure 1 below illustrates the site layout and the proposed development
area. A detailed description of the site is given in Section 2.

x ne Oa ee. wy

   

Text Figure 1: Aerial image of the site, courtesy Nearmap 15 May 2021

 

Tectonic Geotechnical Pty Ltd
PO Box 899, Buderim, QLD 4556
Office: 07 5478 9016 Email: [email protected]
www.tectonicgeo.com.au
ABN. 83 165 727 828
Log in to download the original file

Slope Stability Report.pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 17 pages

Page 2

Dean & Vanessa McDonald                                                                       21505-001-Rev0
                                                                                              4 February 2022

At the time of the assessment an existing relatively level building platform (approximately 75 m long x 10 m
to 25 m wide) had been previously formed by cut and fill earthworks. It was estimated that fill in this area
ranged up to 2.5 m high, with cuts up to 4.5 m depth. It is anticipated that minimal additional earthworks will
be required (i.e. less than 0.5 m depth/height) for the proposed shed building pad. The client has indicated
the proposed shed is to be located at the north-western end of the building platform with footings to be
wholly found within the cut area, approximately 10 m off the crest of the existing fill batter.

Information supplied by the client indicates the shed will have a plan area of 22.3 m by 11 m and will
comprise a steel portal frame with light weight corrugated steel cladding on a concrete floor slab. The client
has indicated they would like to plant out the upslope cut batter. Text Figure 2 below illustrates the proposed
shed design.




Text Figure 2: Proposed shed design (provided by client)


1.2    Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, council overlays and aerial photographs.

A walk-over survey including dynamic cone penetrometer (DCP) testing was conducted to make an
appraisal of the general condition of the site regarding topography, drainage, vegetation cover, geology,
erosion and condition of existing structures. The walkover was undertaken by an experienced geotechnical
engineer from Tectonic on 17 January 2022.

The results of the desk-top study and walk-over survey are included in Section 2 below.

1.3    Qualifications of Responsible Engineer
This report has been reviewed by Mr. Ashley Davey, an RPEQ with more than 26 years’ experience in
geotechnical engineering, including numerous slope stability projects.




                                                           2/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

At the time of the assessment an existing relatively level building platform (approximately 75 m long x 10 m
to 25 m wide) had been previously formed by cut and fill earthworks. It was estimated that fill in this area
ranged up to 2.5 m high, with cuts up to 4.5 m depth. It is anticipated that minimal additional earthworks will
be required (i.e. less than 0.5 m depth/height) for the proposed shed building pad. The client has indicated
the proposed shed is to be located at the north-western end of the building platform with footings to be
wholly found within the cut area, approximately 10 m off the crest of the existing fill batter.

Information supplied by the client indicates the shed will have a plan area of 22.3 m by 11 m and will
comprise a steel portal frame with light weight corrugated steel cladding on a concrete floor slab. The client
has indicated they would like to plant out the upslope cut batter. Text Figure 2 below illustrates the proposed
shed design.

 

Text Figure 2: Proposed shed design (provided by client)

1.2 Method and Scope of Investigation

As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, council overlays and aerial photographs.

A walk-over survey including dynamic cone penetrometer (DCP) testing was conducted to make an
appraisal of the general condition of the site regarding topography, drainage, vegetation cover, geology,
erosion and condition of existing structures. The walkover was undertaken by an experienced geotechnical
engineer from Tectonic on 17 January 2022.

The results of the desk-top study and walk-over survey are included in Section 2 below.
1.3 Qualifications of Responsible Engineer

This report has been reviewed by Mr. Ashley Davey, an RPEQ with more than 26 years’ experience in
geotechnical engineering, including numerous slope stability projects.

 

<a @
té mn i, ¢
geotechnical & environmental engineers.

2/12

Page 3

Dean & Vanessa McDonald                                                                      21505-001-Rev0
                                                                                             4 February 2022

2.0      DESCRIPTION OF EXISTING CONDITIONS
2.1    Geology
The 1:100,000 scale Gympie Special Geological Map (Sheet 9445 and Part 9545) indicates that the site is
underlain by early to middle Triassic age phyllite (Rk) of the Kin Kin beds. An inferred fault (dashed black
line) is indicated on the mapping approximately 100 m west of the subject site. An extract from the
geological map is shown in Text Figure 3 below.




                                                 Approximate site location




Text Figure 3: Extract from geological map
At the time of the assessment, the upslope shed cutting ranged up to about 4.5 m deep and typically
exposed topsoil to 0.1 m below ground level (BGL), then residual clays up to 1.0 m BGL overlying very low to
low strength phyllite tending towards medium strength with depth. Text Figure 4 below shows the upslope
cut batter at the time of the assessment.

        Residual clay soils




                                                              Very low to low strength
                                                              phyllite grading to
                                                              medium strength



Text Figure 4: Upslope building pad cut batter




                                                       3/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

2.0 DESCRIPTION OF EXISTING CONDITIONS

2.1 Geology

The 1:100,000 scale Gympie Special Geological Map (Sheet 9445 and Part 9545) indicates that the site is
underlain by early to middle Triassic age phyllite (Rk) of the Kin Kin beds. An inferred fault (dashed black
line) is indicated on the mapping approximately 100 m west of the subject site. An extract from the
geological map is shown in Text Figure 3 below.

i a aT a]
Ea
a

!
!
1
i
a=
:
f
/
/
i
i

    
  
 

 

 

ub

\ lf =

A ome
tga Approximate site location

 

 
 

 

 

 

LMaroothy i

 

 

  

 

 

 

 

 

 

 

 

 

 

s SS PJ a
s4q77 “f />——~ | ROAD {
pda cht Gl
WY 20 | ow E Orit]
| ° 'b ( 2 ii » )
40 (LI Lf

\ LK p | jp

 

Text Figure 3: Extract from geological map

At the time of the assessment, the upslope shed cutting ranged up to about 4.5 m deep and typically
exposed topsoil to 0.1 m below ground level (BGL), then residual clays up to 1.0 m BGL overlying very low to
low strength phyllite tending towards medium strength with depth. Text Figure 4 below shows the upslope
cut batter at the time of the assessment.

 

Text Figure 4: Upslope building pad cut batter

 

as
Cenic

3/12

Page 4

Dean & Vanessa McDonald                                                                          21505-001-Rev0
                                                                                                 4 February 2022

Approximately 15 m downslope from the building pad, an access track was observed to be cut into the
natural slope with exposed weathered phyllite cut batters up to 2 m height. The cutting was located at the
toe of fill battering back to the shed building pad as seen in Text Figure 5 below.




Text Figure 5: Exposed weathered phyllite batter on downslope access track
The building pad exposed weathered phyllite to the west and comprised previously placed ‘uncontrolled’ fill
to the east. The ‘uncontrolled’ fill appeared to comprise gravelly clay with weathered phyllite cobbles. To
make an appraisal of the strength of the fill materials at the building pad, Tectonic undertook two standalone
DCP tests (designated DCP1 & DCP2). DCP1 and DCP2 were undertaken about 3 m back from the fill
batter crest.
DCP1 and DCP2 indicated initially stiff / medium dense materials to 0.3 m to 0.5 m BGL, then firm to stiff /
loose to medium dense materials to 2.5 m BGL in DCP1 and 1.5 m BGL. These were underlain by stiff to
very stiff (or stiffer) / dense (or denser) materials, which are inferred to be residual soils grading to weathered
phyllite as observed in cut batters.
DCP reports are attached at the end of this report.
2.2    Topography
As illustrated in Text Figures 6 & 7 overleaf, the proposed shed site is located in the south-western corner of
the allotment, mid slope and to the east of Old Ceylon Road which generally traces a southerly dipping
ridgeline. The allotment generally falls north to south with a natural gully that bisects the property.
Downslope to the east of the proposed shed site is a dam that catches surface runoff from the natural gully.

Text Figure 6 overleaf indicates the topographic features observed during the site walkover, noting that
ground slopes were recorded using a hand-held clinometer. The inferred natural ground slope across the
development site (prior to earthworks) was about 15°, with slopes of 10° to 12° observed above the cut
batter, and slopes of 15° to 20° downslope of the access track down into the dam.

As stated previously, the proposed development area had been altered previously by cut and fill earthworks
to create a relatively level building platform. Upslope cuts in the order of up to 4.5 m depth were battered at
15° to 25°. Fill was estimated up to 2.5 m height, with downslope fill batters typically ranging up to 25°. Text
Figure 7 overleaf appears to show the previous natural contours before the earthworks were completed. It is
noted that a slight gully was present through the location of DCP1 which is in line with the deeper fill inferred
from the DCP results. The building platform slopes slightly downslope from west to east.




                                                         4/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

Approximately 15 m downslope from the building pad, an access track was observed to be cut into the
natural slope with exposed weathered phyllite cut batters up to 2 m height. The cutting was located at the
toe of fill battering back to the shed building pad as seen in Text Figure 5 below.

 

tae

Text Figure 5: Exposed weathered phyllite batter on downslope access track

The building pad exposed weathered phyllite to the west and comprised previously placed ‘uncontrolled’ fill
to the east. The ‘uncontrolled’ fill appeared to comprise gravelly clay with weathered phyllite cobbles. To
make an appraisal of the strength of the fill materials at the building pad, Tectonic undertook two standalone
DCP tests (designated DCP1 & DCP2). DCP1 and DCP2 were undertaken about 3 m back from the fill
batter crest.

DCP1 and DCP2 indicated initially stiff / medium dense materials to 0.3 m to 0.5 m BGL, then firm to stiff /
loose to medium dense materials to 2.5 m BGL in DCP1 and 1.5 m BGL. These were underlain by stiff to
very stiff (or stiffer) / dense (or denser) materials, which are inferred to be residual soils grading to weathered
phyllite as observed in cut batters.

DCP reports are attached at the end of this report.
2.2 Topography

As illustrated in Text Figures 6 & 7 overleaf, the proposed shed site is located in the south-western corner of
the allotment, mid slope and to the east of Old Ceylon Road which generally traces a southerly dipping
ridgeline. The allotment generally falls north to south with a natural gully that bisects the property.
Downslope to the east of the proposed shed site is a dam that catches surface runoff from the natural gully.

Text Figure 6 overleaf indicates the topographic features observed during the site walkover, noting that
ground slopes were recorded using a hand-held clinometer. The inferred natural ground slope across the
development site (prior to earthworks) was about 15°, with slopes of 10° to 12° observed above the cut
batter, and slopes of 15° to 20° downslope of the access track down into the dam.

As stated previously, the proposed development area had been altered previously by cut and fill earthworks

to create a relatively level building platform. Upslope cuts in the order of up to 4.5 m depth were battered at

15° to 25°. Fill was estimated up to 2.5 m height, with downslope fill batters typically ranging up to 25°. Text
Figure 7 overleaf appears to show the previous natural contours before the earthworks were completed. It is
noted that a slight gully was present through the location of DCP1 which is in line with the deeper fill inferred
from the DCP results. The building platform slopes slightly downslope from west to east.

 

<a @
té mn 7 ¢c
geotechnical & environmental engineers.

42

Page 5

Dean & Vanessa McDonald                                                                           21505-001-Rev0
                                                                                                  4 February 2022




                                              15°
                                                                      Proposed Shed
                                                                      Location




Text Figure 6: Image showing ground surface contours (10 m), courtesy QGlobe



             Proposed Shed
                   Location
                                                    DCP2



                                                               DCP1




                                                                       20°




Text Figure 7: Image showing ground surface contours (1 m) of building platform, courtesy NC Mapping


Text Figures 8 to 10 on the following pages illustrate the general site conditions at the time of the
assessment.




                                                        5/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

  
    

| | ;
is: 2. re wets 5 a Py! Ss
Text Figure 6: Image showing ground surface contours (10 m), courtesy QGlobe
es ay
Proposed Shed]

pe

bie YOO)

  

   

a
Text Figure 7:

  

ha
Mapping

aa) ey

= : J
age showing ground surface contours (1 m) of building platform, courtesy NC

 

Text Figures 8 to 10 on the following pages illustrate the general site conditions at the time of the
assessment.

 

as
/enic

5/12

Page 6

Dean & Vanessa McDonald                                                    21505-001-Rev0
                                                                           4 February 2022




Text Figure 8: Southern view across building platform




Text Figure 9: Looking north along access track below proposed shed site




                                                         6/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

 

Text Figure 9: Looking north along access track below proposed shed site

 

=
/enic

6/12

Page 7

Dean & Vanessa McDonald                                                                         21505-001-Rev0
                                                                                                4 February 2022




Text Figure 10: Eastern view across proposed shed site from Old Ceylon Road

2.3   Groundwater
No seepage or ‘springs’ were observed in the vicinity of the proposed shed site.

2.4   Surface Drainage
Natural surface drainage from the shed site follows surface contours towards the south-east. The natural
slopes appeared to be relatively well drained at the time of the walk-over. Surface water is expected to
drain rapidly from the natural slopes considering the moderate to steep gradients, relatively low permeability
clay soils and shallow depth to rock.

At the time of our visit, the previously formed building pad graded slightly to the east allowing surface runoff
to overtop fill batter crest causing surface erosion and scouring. It appeared that a diversion swale had
been installed above the northern end of the cut batter channelling runoff north away from the proposed
shed site. A small swale drain had been cut on the upslope side of the downslope access track sending
runoff in a southerly direction.

2.5   Vegetation
At the time of the inspection, the proposed development area was sporadically grassed. Dense high grass
and shrub vegetation several large mature trees was otherwise observed around the shed site. Most of the
trees appeared to be relatively straight, with no obvious signs of distorted growth which could be attributed
to slope instability.

2.6   Buildings and Other Structures
At the time of the assessment no structures were observed in vicinity of the proposed shed site other than
two shipping containers located at the southern end of the building pad.




                                                       7/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

 

Text Figure 10: Eastern view across proposed shed site from Old Ceylon Road

2.3 Groundwater
No seepage or ‘springs’ were observed in the vicinity of the proposed shed site.
2.4 Surface Drainage

Natural surface drainage from the shed site follows surface contours towards the south-east. The natural
slopes appeared to be relatively well drained at the time of the walk-over. Surface water is expected to
drain rapidly from the natural slopes considering the moderate to steep gradients, relatively low permeability
clay soils and shallow depth to rock.

At the time of our visit, the previously formed building pad graded slightly to the east allowing surface runoff
to overtop fill batter crest causing surface erosion and scouring. It appeared that a diversion swale had
been installed above the northern end of the cut batter channelling runoff north away from the proposed
shed site. A small swale drain had been cut on the upslope side of the downslope access track sending
runoff in a southerly direction.

2.5 Vegetation

At the time of the inspection, the proposed development area was sporadically grassed. Dense high grass
and shrub vegetation several large mature trees was otherwise observed around the shed site. Most of the
trees appeared to be relatively straight, with no obvious signs of distorted growth which could be attributed
to slope instability.

2.6 Buildings and Other Structures

At the time of the assessment no structures were observed in vicinity of the proposed shed site other than
two shipping containers located at the southern end of the building pad.

 

=
Céenic

712

Page 8

Dean & Vanessa McDonald                                                                       21505-001-Rev0
                                                                                              4 February 2022

3.0     ASSESSMENT OF LAND STABILITY
3.1   Existing Conditions
As illustrated in Text Figure 11, NC’s landslide hazard overlay map indicates that the proposed shed site has
a Moderate (pale yellow shading) landslide susceptibility, whilst areas across the site (typically gullies) are
mapped as having a High (orange shading) landslide susceptibility.




                                                                 Proposed Shed Location




Text Figure 11: Extract from NC Landslide Hazard Mapping

It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility and
is superseded by this site specific assessment. The site did not exhibit any indicators of global, natural
slope instability at the time of our inspection. No landslide back scarps or areas of naturally ‘hummocky’
ground were observed in the vicinity of the proposed building area, with residual soil and exposed rock in
existing cut batters.

3.2   Stability Risk Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 overleaf and
the Qualitative Terminology for Use in Assessing Risk to Property is also attached.




                                                       8/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

3.0 ASSESSMENT OF LAND STABILITY
3.1. Existing Conditions

As illustrated in Text Figure 11, NC’s landslide hazard overlay map indicates that the proposed shed site has
a Moderate (pale yellow shading) landslide susceptibility, whilst areas across the site (typically gullies) are
mapped as having a High (orange shading) landslide susceptibility.

MM Very High Hazard Area
4

WB High Hazard Area

Moderate Hazard Area

¥

 

Text Figure 11: Extract from NC Landslide Hazard Mapping

It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility and
is superseded by this site specific assessment. The site did not exhibit any indicators of global, natural
slope instability at the time of our inspection. No landslide back scarps or areas of naturally ‘hummocky’
ground were observed in the vicinity of the proposed building area, with residual soil and exposed rock in
existing cut batters.

3.2 Stability Risk Assessment

The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 overleaf and
the Qualitative Terminology for Use in Assessing Risk to Property is also attached.

 

ynic

geotechnical & environmental engineers.

 

8/12

Page 9

Dean & Vanessa McDonald                                                                                       21505-001-Rev0
                                                                                                              4 February 2022

 Table 1: Stability Risk Levels

 Risk Level             Example Implications(1)
                        Unacceptable without treatment. Extensive detailed investigation and research, planning
       Very High
 VH                     and implementation of treatment options essential to reduce risk to Low; may be too
       Risk
                        expensive and not practical. Work likely to cost more than value of property.
                        Unacceptable without treatment. Detailed investigation, planning and implementation of
 H     High Risk        treatment options required to reduce risk to Low. Work would cost a substantial sum in
                        relation to the value of the property.
                        May be tolerated in certain circumstances (subject to regulators’ approval) but requires
       Moderate
 M                      investigation, planning and implementation of treatment options to reduce risk to Low.
       Risk
                        Treatment options to reduce to Low risk should be implemented as soon as practicable.
                        Usually acceptable to regulators. Where treatment has been required to reduce the risk
 L     Low Risk
                        to this level, ongoing maintenance required.
       Very Low
 VL                     Acceptable. Manage by normal slope maintenance procedures.
       Risk
 Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
 depend on the nature of the property at risk; these are only given as a general guide.

Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given in Section 4, it is assessed that there would be a Low (L) Risk of global slope
instability affecting the proposed shed. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in
Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).
 Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)

                                               Assessed
 Hazard               Likelihood Consequence
                                                 Risk     Comments

                                                          The likelihood of a failure through the existing cut batters or fill
                                                          embankments adjacent to the building platform is considered
 1: Failure through
                                                          Unlikely, given the favourable topography, lack of groundwater, lack
the existing cut
                       Unlikely   Medium         Low      of evidence of existing natural instability and subject to implementation
batters or fill
                                                          of the recommendations specified in Section 4. The consequence of
embankments
                                                          such a failure would remain Medium, with the resultant risk being Low
                                                          as per AGS 2007.

                                                          The likelihood of a deep failure through the weathered rock is assessed
 2: Deep failure
                                                          as Barely Credible due to the strength of such materials, and no
through weathered      Barely      Major       Very Low   evidence of deep-seated instability in the area. Although the
rock below the        Credible                            consequence of such a failure could be Major, the resultant risk would
foundation depth
                                                          be Very Low as per AGS 2007.



The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.




                                                            9/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO

4 February 2022

 

Table 1: Stability Risk Levels

 

 

 

 

 

 

Risk Level Example Implications(1)
Very High Unacceptable without treatment. Extensive detailed investigation and research, planning
VH ery Tg and implementation of treatment options essential to reduce risk to Low; may be too
Risk - . :
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H High Risk | treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Moderate are . , : : :
M . investigation, planning and implementation of treatment options to reduce risk to Low.
Risk . . :
Treatment options to reduce to Low risk should be implemented as soon as practicable.
5 Usually acceptable to regulators. Where treatment has been required to reduce the risk
L Low Risk ~ A ~ .
to this level, ongoing maintenance required.
VL very Low Acceptable. Manage by normal slope maintenance procedures.

 

 

 

Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.

Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given in Section 4, it is assessed that there would be a Low (L) Risk of global slope
instability affecting the proposed shed. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in
Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).

Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)

 

Hazard

J Assessed

Likelihood|Consequenc Risk Comments

 

1: Failure through
the existing cut
batters or fill
embankments

The likelihood of a failure through the existing cut batters or fill
embankments adjacent to the building platform is considered
Unlikely, given the favourable topography, lack of groundwater, lack
Unlikely Medium Low of evidence of existing natural instability and subject to implementation
of the recommendations specified in Section 4. The consequence of
such a failure would remain Medium, with the resultant risk being Low
as per AGS 2007.

 

2: Deep failure
through weathered
rock below the
foundation depth

 

The likelihood of a deep failure through the weathered rock is assessed
as Barely Credible due to the strength of such materials, and no

Barely Major Very Low | evidence of deep-seated instability in the area. Although the
Credible consequence of such a failure could be Major, the resultant risk would
be Very Low as per AGS 2007.

 

 

 

 

The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.

 

tectenic

9/12

Page 10

Dean & Vanessa McDonald                                                                            21505-001-Rev0
                                                                                                   4 February 2022

4.0       RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

4.1     Earthworks
Based on the proposed development and the existing site conditions it is anticipated minimal cut and fill
earthworks will be required (i.e. less than 0.5 m depth/height). Should proposed cut/fill exceed 0.5 m
depth/height, the impacts on slope stability must be reviewed by Tectonic before construction.

It has been indicated that landscaping is proposed for the upslope cut batter. If adopted, permanent batter
slopes in the exposed weathered phyllite should not exceed 1V:3H for topsoil and plants or 1V:4H for grass
that is to be maintained by ride-on mower.
The shed pad should be proof rolled to identify any soft spots, which should be removed and replaced with
select, compacted fill. The pad surface should be re-graded at a minimum 1V:100H ‘into’ the hillside (west)
to prevent surface water overtopping the fill embankment on the eastern side.

Excavations in the natural soils and very low to low strength phyllite should be achievable using conventional
earthmoving equipment (e.g. small to medium sized excavators in the 5 tonne to 12 tonne range). However,
excavations into medium strength (or stronger) phyllite may be difficult and may require the use of ripping
tynes and/or rock hammer attachments. Where excavation into rock is required the contractor must consider
the effects of noise and vibrations.

Temporary batters in stiff (or stiffer) natural soils may be formed at 1V:1H; with permanent batters formed no
steeper than 1V:2H in natural soils or 1V:1H in weathered rock. Flatter batters may be required if
groundwater seepage is encountered. Permanent batters will require erosion protection such as covering
with erosion matting or vegetation. Where spatial constraints prevent adoption of the above recommended
batter slopes, cut or fill batters would need to be supported by retaining walls.

Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be
noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion
and sediment control measures must be installed prior to commencement of any further earthworks at this
site.

The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

4.2     Retaining Structures
Retaining structures must be founded as described in Section 4.3 below. Retaining structures greater than
1 m high will require engineer design and certification of construction. Retaining structures should be
engineer designed in accordance with AS4678-2002 Earth-retaining structures. We suggest the following
parameters in Table 3 may be adopted for retaining wall design.
 Table 3: Retaining Wall Design Parameters
                                                             Lateral earth pressure coefficients
                          Unit      Friction
 Retained material      weight       angle
                                                         Ka                     Ko
                        (kN/m3)    (Degrees)                                                        Kp
                                                  (Cantilever wall)     (Non-yielding wall)
 Stiff (or stiffer)
                          19           25               0.40                   0.57                2.46
 Clays

 Weathered Rock           21           35               0.27                   0.43                3.69


The values in Table 3 assume that the walls are fully drained and no allowance is included for hydrostatic
pressures, construction loading, up-slope footing loadings, the effects of sloping ground and backfill
compaction stresses.




                                                     10/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

4.0 RECOMMENDATIONS

General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

4.1 Earthworks

Based on the proposed development and the existing site conditions it is anticipated minimal cut and fill
earthworks will be required (i.e. less than 0.5 m depth/height). Should proposed cut/fill exceed 0.5 m
depth/height, the impacts on slope stability must be reviewed by Tectonic before construction.

It has been indicated that landscaping is proposed for the upslope cut batter. If adopted, permanent batter
slopes in the exposed weathered phyllite should not exceed 1V:3H for topsoil and plants or 1V:4H for grass
that is to be maintained by ride-on mower.

The shed pad should be proof rolled to identify any soft spots, which should be removed and replaced with
select, compacted fill. The pad surface should be re-graded at a minimum 1V:100H ‘into’ the hillside (west)
to prevent surface water overtopping the fill embankment on the eastern side.

Excavations in the natural soils and very low to low strength phyllite should be achievable using conventional
earthmoving equipment (e.g. small to medium sized excavators in the 5 tonne to 12 tonne range). However,
excavations into medium strength (or stronger) phyllite may be difficult and may require the use of ripping
tynes and/or rock hammer attachments. Where excavation into rock is required the contractor must consider
the effects of noise and vibrations.

Temporary batters in stiff (or stiffer) natural soils may be formed at 1V:1H; with permanent batters formed no
steeper than 1V:2H in natural soils or 1V:1H in weathered rock. Flatter batters may be required if
groundwater seepage is encountered. Permanent batters will require erosion protection such as covering
with erosion matting or vegetation. Where spatial constraints prevent adoption of the above recommended
batter slopes, cut or fill batters would need to be supported by retaining walls.

Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be
noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion
and sediment control measures must be installed prior to commencement of any further earthworks at this
site.

The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

4.2 Retaining Structures

Retaining structures must be founded as described in Section 4.3 below. Retaining structures greater than
1 m high will require engineer design and certification of construction. Retaining structures should be
engineer designed in accordance with AS4678-2002 Earth-retaining structures. We suggest the following
parameters in Table 3 may be adopted for retaining wall design.

 

 

 

 

Table 3: Retaining Wall Design Parameters
Unit Friction Lateral earth pressure coefficients
Retained material weight angle Ka Ko
3"

(kNim*) (Degrees) (Cantilever wall) (Non-yielding wall) Kp
Stiff (or stiffer) 19 25 0.40 0.57 2.46
Clays
Weathered Rock 21 35 0.27 0.43 3.69

 

 

 

 

 

 

The values in Table 3 assume that the walls are fully drained and no allowance is included for hydrostatic
pressures, construction loading, up-slope footing loadings, the effects of sloping ground and backfill
compaction stresses.

 

tectenic

10/12

Page 11

Dean & Vanessa McDonald                                                                           21505-001-Rev0
                                                                                                  4 February 2022

4.3   Footing Design
Footings for the proposed shed and any ancillary structures (e.g. tanks or retaining walls) should penetrate
through any fill, and residual soils, to found a minimum of 0.3 m into very low strength (or stronger) rock.
Footings so founded may be designed using an allowable bearing pressure of 400 kPa. It is understood that
the shed slab and footings will found directly on/into such rock.
Footing design should also account for potential soil reactivity, to be assessed by others.

All footings should found such that they are not adversely affected by any adjacent excavations, trenches, or
retaining walls that are not designed to support building loads. Footings should found at least below a plane
extending 1 m horizontally from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as
illustrated in Text Figure 12.




                 Text Figure 12: Footing depth required to prevent undermining or surcharge loading

Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the
full base area. A suitably qualified and experienced RPEQ engineer must inspect the footing excavations to
confirm appropriate foundation materials and cleanliness prior to pouring concrete.
If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
must be notified immediately and an inspection carried out to determine if changes to footing design are
required.

4.4   Drainage
Adequate site drainage must be installed to ensure that surface water flows are controlled, and diverted
away from the building area and batters. Flows must not be allowed to form concentrated streams running
across the building platform, adjacent batter slopes or over top retaining walls. Lined (with turf, rock,
concrete, or similar) cut off/diversion drains should be constructed along the crests and toes of the existing
batters and directed via lined batter chute drains or pipes to discharge at least 5 m down slope of any




                                                        11/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

4.3 Footing Design

Footings for the proposed shed and any ancillary structures (e.g. tanks or retaining walls) should penetrate
through any fill, and residual soils, to found a minimum of 0.3 m into very low strength (or stronger) rock.
Footings so founded may be designed using an allowable bearing pressure of 400 kPa. It is understood that
the shed slab and footings will found directly on/into such rock.

Footing design should also account for potential soil reactivity, to be assessed by others.

All footings should found such that they are not adversely affected by any adjacent excavations, trenches, or
retaining walls that are not designed to support building loads. Footings should found at least below a plane
extending 1 m horizontally from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as
illustrated in Text Figure 12.

TRENCH BACKFILL
GROUND LEVEL /

 

aS

   

a
TRENCH SIDEWALL ~

 

7 — \FOUND F
ie BELOW THIS UNE

 

 

 

SEWER / STORMWATER PIPE

 

 

 

 

 

 

 

 

RETAINING WALL

Text Figure 12: Footing depth required to prevent undermining or surcharge loading

Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the
full base area. A suitably qualified and experienced RPEQ engineer must inspect the footing excavations to
confirm appropriate foundation materials and cleanliness prior to pouring concrete.

If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
must be notified immediately and an inspection carried out to determine if changes to footing design are
required.

4.4 Drainage

Adequate site drainage must be installed to ensure that surface water flows are controlled, and diverted
away from the building area and batters. Flows must not be allowed to form concentrated streams running
across the building platform, adjacent batter slopes or over top retaining walls. Lined (with turf, rock,
concrete, or similar) cut off/diversion drains should be constructed along the crests and toes of the existing
batters and directed via lined batter chute drains or pipes to discharge at least 5 m down slope of any

 

tectenic

11/12

Page 12

Dean & Vanessa McDonald                                                                         21505-001-Rev0
                                                                                                4 February 2022

structures or fill batters and not as concentrated discharge upslope of any neighboring
structures/embankments. The platform should be graded slightly (minimum 1V:100H) back ‘into’ the
exposed rock batter slope to drain appropriately to the diversion drainage system and not allow over topping
of the downslope fill batters.

Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.

It would be prudent to construct a rock dissipator or rock contour drain at the drainage outlet point(s) to
minimise erosion. Drains should be directed to discharge towards the natural drainage lines.
Subsurface disposal of stormwater must not be undertaken (including infiltration pits).


5.0     SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
affecting the proposed shed, subject to implementation of the recommendations given in this report.



6.0     LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.

Please contact the undersigned should you wish to discuss any of the above matters.

Yours faithfully,

TECTONIC GEOTECHNICAL PTY LTD




Jarrad McVey BEng (Civil) (Hons)                           Ashley Davey RPEQ 8159
Geotechnical Engineer                                      Director/Principal Geotechnical Engineer


Attachments: DCP Reports
             Qualitative Terminology for Use in Assessing Risk to Property
             Some Guidelines for Hillside Construction
             Limitations




                                                       12/12


[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022

 

structures or fill batters and not as concentrated discharge upslope of any neighboring
structures/embankments. The platform should be graded slightly (minimum 1V:100H) back ‘into’ the
exposed rock batter slope to drain appropriately to the diversion drainage system and not allow over topping
of the downslope fill batters.

Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.

It would be prudent to construct a rock dissipator or rock contour drain at the drainage outlet point(s) to
minimise erosion. Drains should be directed to discharge towards the natural drainage lines.

Subsurface disposal of stormwater must not be undertaken (including infiltration pits).

5.0 SUMMARY & CONCLUSIONS

Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
affecting the proposed shed, subject to implementation of the recommendations given in this report.

6.0 LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.
Please contact the undersigned should you wish to discuss any of the above matters.

Yours faithfully,

TECTONIC GEOTECHNICAL PTY LTD

MM

Jarrad McVey BEng (Civil) (Hons) Ashley Davey RPEQ 8159
Geotechnical Engineer Director/Principal Geotechnical Engineer

Attachments: DCP Reports
Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction
Limitations

 

tectenic

12/12

Page 13

                                                                                                                                                                                                                     CLIENT      : Dean & Vanessa McDonald                                                                                       SHEET   : 1 OF 1
                                                                                                                                                                                                                     CONTRACTOR : Tectonic
                                                                                                                                                                                                                     PROJECT     : Proposed Shed
                                                                                                                                                                                                                     LOCATION    : 315 Old Ceylon Road, Ridgewood
                                                                                                                                                                                                                     PROJECT No. : 21505

                                                                                                                                                                                                                                                                  TEST: DCP 1                                                   TEST: DCP 2
                                                                                                                                                                                                                                  LOGGED: JPM 17/1/2022                                         LOGGED: JPM 17/1/2022
                                                                                                                                                                                                                                  EASTING: 486599.0 m NORTHING: 7073280.0 m                     EASTING: 486599.0 m NORTHING: 7073292.0 m
                                                                                                                                                                                                                                  MGA2020 Zone 56                                               MGA2020 Zone 56
                                                                                                                                                                                                                      Depth (m)




                                                                                                                                                                                                                                                                                    Depth (m)
                                                                                                                                                                                                                                      Blows per 100 mm (AS 1289.6.3.2-1997)                         Blows per 100 mm (AS 1289.6.3.2-1997)
                                                                                                                                                                                                                                  0      5         10      15         20      25                0      5         10      15         20      25




                                                                                                                                                                                                                     0.5                                                           0.5




                                                                                                                                                                                                                     1.0                                                           1.0
TECTONIC 3.00.2 LIB.GLB Log IS DCP 3 PER PAGE 21505 DCP SHEETS.GPJ <<DrawingFile>> 28/1/2022 13:38 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                     1.5                                                           1.5




                                                                                                                                                                                                                     2.0                                                           2.0




                                                                                                                                                                                                                     2.5                                                           2.5




                                                                                                                                                                                                                     3.0                                                           3.0




                                                                                                                                                                                                                       Comments                                                     Comments


[OCR of page images]
TECTONIC 3.00.2 LIB.GLB Log 1S DCP 3 PER PAGE 21505 DCP SHEETS.GPY <<DrawingFile>> 28/1/2022 13:38 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30

 

W

 

geotechnical & environmental engineers

 

 

CLIENT : Dean & Vanessa McDonald
CONTRACTOR : Tectonic

PROJECT Proposed Shed

LOCATION : 315 Old Ceylon Road, Ridgewood

PROJECT No. : 21505

 

 

SHEET

:1 OF 1

 

 

LOGGED: JPM 17/1/2022
EASTING: 486599.0 m NORTHING: 7073280.0 m

 

TEST: DCP 1

LOGGED: JPM 17/1/2022
EASTING: 486599.0 m NORTHING: 7073292.0 m

 

TEST: DCP 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

€ | MGA2020 Zone 56 € | MGA2020 Zone 56
& Blows per 100 mm (AS 1289.6.3.2-1997) € Blows per 100 mm (AS 1289.6.3.2-1997)
& |o 5 10 15 20 25 & jo 5 10 15 20 25
0.5
1.0
15
2.0
2.5
3.0
Comments Comments

 

 

 

 

Page 14

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039
  68039        RL2Risk
         Landslide August 2010
                       Management Issued 10/7/07


[OCR of page images]
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY

QUALITATIVE MEASURES OF LIKELIHOOD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ay imate Annual Probabilit
Pproximate Annual Frovanmy Implied Indicative Landslide Description Descriptor Level
Indicative Notional Recurrence Interval P P
Value Boundary
107 5x102 10 years 20 The event is expected to occur over the design life. ALMOST CERTAIN A
years ill pr 7 iti 7
102 100 years we “vent will probably occur under adverse conditions over the LIKELY B
3 5x10° 200 years s ~ — - -
10 4 1000 years 2000 vears The event could occur under adverse conditions over the design life. | POSSIBLE Cc
5x10" . i r 7
104 10,000 years ae “ven might occur under very adverse circumstances over the UNLIKELY D
: 5x10° 20,000 years thes + £- ivable b T di ional ci
10 100,000 years event is conceivable but only under exceptional circumstances | p app E
5x10°° 200,000 over the design life.
10° 1,000,000 years ue vears The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Indicative Notional Description Descriptor Level
Value Boundary
200% Structure(s) completely destroyed and/or large scale damage requiring major engineering works for CATASTROPHIC 1
° 100% stabilisation. Could cause at least one adjacent property major consequence damage.
60% ° Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant MAJOR 2
° 40% stabilisation works. Could cause at least one adjacent property medium consequence damage.
20% ° Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works. MEDIUM
° 10% Could cause at least one adjacent property minor consequence damage.
5% 9 Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4
1%
Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
9
0.5% notional boundary of 0.1%. See Risk Matrix.) INSIGNIFICANT 5
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.

(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.

(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa

Form No. 68039 RL2 August 2010

Australian Geomechanics Vol 42 No 1 March 2007

 

 

Page 15

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
 Form No. Landslide
    68039 68039 RL2Risk
                    August 2010
                        Management           Issued 10/7/07


[OCR of page images]
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: —- QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)

QUALITATIVE RISK ANALYSIS MATRIX —- LEVEL OF RISK TO PROPERTY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIKELIHOOD CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
Indicative Value of 1: CATASTROPHIC 2: MAJOR 3: MEDIUM 4; MINOR 5:
Approximate Annual 200% 60% 20% 5% INSIGNIFICANT
Probability 0.5%
A - ALMOST CERTAIN 107 H MorL (5)
B - LIKELY 107 H M L
C - POSSIBLE 10° M M VL
D - UNLIKELY 10" L L VL
E - RARE 10° M L L VL VL
F - BARELY CREDIBLE 10° L VL VL VL VL

 

 

 

 

 

 

 

Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time.

RISK LEVEL IMPLICATIONS

 

Risk Level Example Implications (7)

 

 

Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.

Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce

la SN risk to Low. Work would cost a substantial sum in relation to the value of the property.

 

May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
M MODERATE RISK implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.

 

Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is

L LOW RISK :
required.

 

 

VL VERY LOW RISK Acceptable. Manage by normal slope maintenance procedures.

 

 

 

Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
given as a general guide.

Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039 RL2 August 2010

 

Page 16

           PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                 APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                        GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
      ADVICE
      GEOTECHNICAL      Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
      ASSESSMENT        stage of planning and before site works.                                             geotechnical advice.
      PLANNING
      SITE PLANNING     Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                        arising from the identified hazards and consequences in mind.
      DESIGN AND CONSTRUCTION
                        Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                        or steel frames, timber or panel cladding.                                           filling.
       HOUSE DESIGN
                        Consider use of split levels.                                                        Movement intolerant structures.
                        Use decks for recreational areas where appropriate.
      SITE CLEARING     Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
          ACCESS &      Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
         DRIVEWAYS      Council specifications for grades may need to be modified.                           geotechnical advice.
                        Driveways and parking areas may need to be fully supported on piers.
      EARTHWORKS        Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                        Minimise depth.                                                                      Large scale cuts and benching.
            CUTS        Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                        Provide drainage measures and erosion control.                                       Ignore drainage requirements
                        Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                        Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                        Use clean fill materials and compact to engineering standards.                       onto property below.
            FILLS       Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                        Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                             Include stumps, trees, vegetation, topsoil,
                                                                                                             boulders, building rubble etc in fill.
        ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
         & BOULDERS     Support rock faces where necessary.                                                  boulders.
                        Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                        Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
         RETAINING
                        Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
           WALLS
                        above.                                                                               Lack of subsurface drains and weepholes.
                        Construct wall as soon as possible after cut/fill operation.
                        Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                        Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
          FOOTINGS
                        Design for lateral creep pressures if necessary.
                        Backfill footing excavations to exclude ingress of surface water.
                        Engineer designed.
                        Support on piers to rock where practicable.
      SWIMMING POOLS    Provide with under-drainage and gravity drain outlet where practicable.
                        Design for high soil pressures which may develop on uphill side whilst there
                        may be little or no lateral support on downhill side.
         DRAINAGE
                        Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                        Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
           SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                        Line to minimise infiltration and make flexible where possible.
                        Special structures to dissipate energy at changes of slope and/or direction.
                        Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                        Provide drain behind retaining walls.
         SUBSURFACE
                        Use flexible pipelines with access for maintenance.
                        Prevent inflow of surface water.
                        Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
           SEPTIC &
                        be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
           SULLAGE
                        Storage tanks should be water-tight and adequately founded.                          of landslide risk.
          EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
         CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
        LANDSCAPING
      DRAWINGS AND SITE VISITS DURING CONSTRUCTION
         DRAWINGS       Building Application drawings should be viewed by geotechnical consultant
         SITE VISITS    Site Visits by consultant may be appropriate during construction/
      INSPECTION AND MAINTENANCE BY OWNER
          OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
       RESPONSIBILITY   pipes.
                        Where structural distress is evident see advice.
                        If seepage observed, determine causes or seek advice on consequences.




                                 Australian Geomechanics Vol 42 No 1 March 2007                                                                113
Form No. 68029 RL2 August 2010


[OCR of page images]
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007

APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

GOOD ENGINEERING PRACTICE

POOR ENGINEERING PRACTICE

 

 

 

 

ADVICE

GEOTECHNICAL Obtain advice from a qualified, experienced geotechnical practitioner at early | Prepare detailed plan and start site works before

ASSESSMENT stage of planning and before site works. geotechnical advice.

PLANNING

SITE PLANNING Having obtained geotechnical advice, plan the development with the risk | Plan development without regard for the Risk.
arising from the identified hazards and consequences in mind.

DESIGN AND CONSTRUCTION

 

 

Use flexible structures which incorporate properly designed brickwork, timber
or steel frames, timber or panel cladding.

Floor plans which require extensive cutting and
filling.

 

 

 

 

 

 

HOUSE DESIGN Consider use of split levels. Movement intolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetation wherever practicable. Indiscriminately clear the site.
ACCESS & Satisfy requirements below for cuts, fills, retaining walls and drainage. Excavate and fill for site access before
DRIVEWAYS Council specifications for grades may need to be modified. geotechnical advice.
Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS Retain natural contours wherever possible. Indiscriminatory bulk earthworks.
Minimise depth. Large scale cuts and benching.
Cuts Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts.
Provide drainage measures and erosion control. Ignore drainage requirements
Minimise height. Loose or poorly compacted fill, which if it fails,
Strip vegetation and topsoil and key into natural slopes prior to filling. may flow a considerable distance including
Use clean fill materials and compact to engineering standards. onto property below.
FILLS Batter to appropriate slope or support with engineered retaining wall. Block natural drainage lines.
Provide surface drainage and appropriate subsurface drainage. Fill over existing vegetation and topsoil.
Include stumps, trees, vegetation, topsoil,
boulders, building rubble ete in fill.
ROCK OUTCROPS Remove or stabilise boulders which may have unacceptable risk. Disturb or undercut detached blocks or
& BOULDERS Support rock faces where necessary. boulders.

 

Engineer design to resist applied soil and water forces.

Construct a structurally inadequate wall such as

 

  

Found on rock where practicable. sandstone flagging, brick or unreinforced
RETAINING . . wae a . oe
Provide subsurface drainage within wall backfill and surface drainage on slope | blockwork.
WALLS ° . .
above. Lack of subsurface drains and weepholes.
Construct wall as soon as possible after cut/fill operation.
Found within rock where practicable. il, loose fill, detached boulders
FOOTINGS Use rows of piers or strip footings oriented up and down slope.

Design for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.

 

SWIMMING POOLS

Engineer designed.

Support on piers to rock where practicable.

Provide with under-drainage and gravity drain outlet where practicable.
Design for high soil pressures which may develop on uphill side whilst there
may be little or no lateral support on downhill side.

 

 

 

 

 

 

 

 

 

 

 

DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses. Allow water to pond on bench areas.
SURFACE Provide general falls to prevent blockage by siltation and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Special structures to dissipate energy at changes of slope and/or direction.
Provide filter around subsurface drain. Discharge roof runoff into absorption trenches.
SUBSURFACE Provide drain behind retaining walls.
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
SI Usually requires pump-out or mains sewer systems; absorption trenches may | Discharge sullage directly onto and into slopes.
EPTIC & ria vee . A : .
SULLAGE be possible in some areas if risk is acceptable. Use absorption trenches without consideration
Storage tanks should be water-tight and adequately founded. of landslide risk.
EROSION Control erosion as this may lead to instability. Failure to observe earthworks and drainage
CONTROL & Revegetate cleared area. recommendations when landscaping.
LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Building Application drawings should be viewed by geotechnical consultant
SITE VISITS Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
OWNER’S Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY pipes.

 

Where structural distress is evident see advice.
If seepage observed, determine causes or seek advice on consequences.

 

 

Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

 

Page 17

          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




    114                      Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010


[OCR of page images]
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007

    
  
 
 
  
  
  
 
 
 
  
 

EXAMPLES OF GOOD HILLSIDE PRACTICE

Vegetation retained

Surface water interception drainage —

Watertight, adequately sited and founded
roof water storage tanks (with due regard for
impact of potential leakage)

Flexible structure ———— \
Roof water piped off site or stored

On-site detention tanks, watertight and
adequately founded. Potential leakage
managed by sub-soil drains “>

\. MANTLE OF SOIL AND ROCK
FRAGMENTS (COLLUVIUM)

 
 
 
 
 
 

Vegetation retained \

\ *—Pier footings into rock
‘— Subsoil drainage may be

\ required in slope
Cutting and filling minimised in development

\
= Sewage effluent pumped out or connected to sewer.
Tanks adequately founded and watertight. Potential
leakage managed by sub-soil drains

     
   

“\— Engineered retaining walls with both surface and
subsurface drainage (constructed before dwelling) @ acs (2006)

EXAMPLES OF POOR HILLSIDE PRACTICE

Unstabilised rock topples
and travels downslope

 

+

    
   
 
  
 
  
 
 
 
 
  
  
 
 
   
 
  
  
  

Vegetation removed ——,

Discharges of roofwater soak Steep ening
away rather than conducted off cut fails
site or to secure storage for re-use ———.

 

Structure unable to tolerate
settlement and cracks

Poorly compacted fill settles
unevenly and cracks pool SX

Inadequate walling unable
to support fill

Loose, saturated fill slides
and possibly flows downslope
Inadequately supported cut fails —, Roofwater introduced into slope

Saturated \
slope fails —
Vegetation Dwelling not founded in bedrock
removed —

il?
Absence of subsoil drainage within fill
Ponded water enters slope and activates landslide (©) AGS (2006)
Pia travel downslope which impacts other development downhill See also AGS. (2000) Appendix J

 

Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

Page 18

                                               LIMITATIONS


This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.




Rev 1 (March 2016)


[OCR of page images]
tecténic

geotechnical & environmental engineers

 

LIMITATIONS

This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.

Rev 1 (March 2016)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.