Slope Stability Report
Dean & Vanessa McDonald 21505-001-Rev0
4 February 2022
Table 1: Stability Risk Levels
Risk Level Example Implications(1)
Unacceptable without treatment. Extensive detailed investigation and research, planning
Very High
VH and implementation of treatment options essential to reduce risk to Low; may be too
Risk
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H High Risk treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Moderate
M investigation, planning and implementation of treatment options to reduce risk to Low.
Risk
Treatment options to reduce to Low risk should be implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk
L Low Risk
to this level, ongoing maintenance required.
Very Low
VL Acceptable. Manage by normal slope maintenance procedures.
Risk
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given in Section 4, it is assessed that there would be a Low (L) Risk of global slope
instability affecting the proposed shed. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in
Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)
Assessed
Hazard Likelihood Consequence
Risk Comments
The likelihood of a failure through the existing cut batters or fill
embankments adjacent to the building platform is considered
1: Failure through
Unlikely, given the favourable topography, lack of groundwater, lack
the existing cut
Unlikely Medium Low of evidence of existing natural instability and subject to implementation
batters or fill
of the recommendations specified in Section 4. The consequence of
embankments
such a failure would remain Medium, with the resultant risk being Low
as per AGS 2007.
The likelihood of a deep failure through the weathered rock is assessed
2: Deep failure
as Barely Credible due to the strength of such materials, and no
through weathered Barely Major Very Low evidence of deep-seated instability in the area. Although the
rock below the Credible consequence of such a failure could be Major, the resultant risk would
foundation depth
be Very Low as per AGS 2007.
The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.
9/12
[OCR of page images]
Dean & Vanessa McDonald 21505-001-RevO
4 February 2022
Table 1: Stability Risk Levels
Risk Level Example Implications(1)
Very High Unacceptable without treatment. Extensive detailed investigation and research, planning
VH ery Tg and implementation of treatment options essential to reduce risk to Low; may be too
Risk - . :
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H High Risk | treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
Moderate are . , : : :
M . investigation, planning and implementation of treatment options to reduce risk to Low.
Risk . . :
Treatment options to reduce to Low risk should be implemented as soon as practicable.
5 Usually acceptable to regulators. Where treatment has been required to reduce the risk
L Low Risk ~ A ~ .
to this level, ongoing maintenance required.
VL very Low Acceptable. Manage by normal slope maintenance procedures.
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given in Section 4, it is assessed that there would be a Low (L) Risk of global slope
instability affecting the proposed shed. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in
Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)
Hazard
J Assessed
Likelihood|Consequenc Risk Comments
1: Failure through
the existing cut
batters or fill
embankments
The likelihood of a failure through the existing cut batters or fill
embankments adjacent to the building platform is considered
Unlikely, given the favourable topography, lack of groundwater, lack
Unlikely Medium Low of evidence of existing natural instability and subject to implementation
of the recommendations specified in Section 4. The consequence of
such a failure would remain Medium, with the resultant risk being Low
as per AGS 2007.
2: Deep failure
through weathered
rock below the
foundation depth
The likelihood of a deep failure through the weathered rock is assessed
as Barely Credible due to the strength of such materials, and no
Barely Major Very Low | evidence of deep-seated instability in the area. Although the
Credible consequence of such a failure could be Major, the resultant risk would
be Very Low as per AGS 2007.
The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.
tectenic
9/12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.