Council archive · source document
07/1586 - Response to Information Request [As Published] · 132007.1586
-5- be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and recommendations aspects or suggestions for design and construction. Since the test sites in any exploration represent a very small proportion of the total site and since the exploration only identifies actual ground conditions at the test sites, even under the best circumstances actual conditions may vary from those inferred to exist. No responsibility is taken for:- * Unexpected variations in ground and/or groundwater conditions. *Changes in policy or interpretation of policy by statutory authorities. * The actions of other persons. «Any work where the company is not given the opportunity to supervise the construction using the Companies designs/recommendations. If differences occur, the Company will be pleased to assist with investigation or advice to resolve any problems occurring. SITE ANOMALIES In the event that conditions encountered on site during construction appear to vary from those expected from the information contained in the report, the Company Most problems are more readily resolved when conditions requests that it immediately be notified. are exposed than at some later stage, well after the event. REPRODUCTION OF INFORMATION FOR CONTRACTUAL PURPOSES Attention is drawn to the document "Guidelines for the Provision of Geotechnical Information in Tender Documents", published by the Institution of Engineers, Where investigation is provided for tendering purposes, it is Australia. information obtained from this recommended that all information, including the written report and discussion, be made available. In circumstances, where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. The Company would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. REVIEW OF DESIGN Where major civil or structural developments are proposed or where only a limited investigation has been completed or where the geotechnical conditions/ constraints are quite complex, it is prudent to have a joint design review which involves a senior geotechnical engineer. We would be happy to assist in this regard as an extension of our investigation commission. SITE INSPECTION The Company will always be pleased to provide engineering inspection services for geotechnical aspects of work to which this report is related. i) Site visits during construction to confirm reported ground conditions ii) personnel in identifying various soil/rock types such as Site visits to assist the contractor or other site appropriate footing or pier founding depths, the stability of a filled or excavated slope; or iii) Fulltime engineering presence on site. In the vast majority of cases it is advantageous to the principal for the geotechnical engineer who wrote the investigation report to be involved in the construction stage of the project. NOTEREP.SAM SOIL SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1586 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.