1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
Callaghan & Toth
TABLE 4.1 MUSIC CATCHMENT AREAS (DEVELOPED)
Catchment Land Use Music Area (ha)
Impervious
CATCHMENT A
Roof Areas – Villas 3 and 4 Urban Residential 100% 0.107
Northern Pathways / Landscaped areas Urban Residential 35% 0.156
CATCHMENT B
Southern Pathways / landscaped areas Urban Residential 35% 0.062
Landscaped Podium Urban Residential 75% 0.040
Roof Areas – Villas 1 and 2 100% 0.107
Urban Residential
- Entry building 0.035
CATCHMENT E - Existing driveways / 3 carparks Urban Residential 90% 0.021
CATCHMENT D - Exposed Carpark Areas Urban Residential 90% 0.025
CATCHMENT F - Exposed Carpark Areas Urban Residential 90% 0.037
TOTAL 0.59ha
4.2.2 Treatment Nodes
The “MUSIC Modelling Guidelines for South East Queensland” Version 1.0 prepared by Water
by Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.
The land use type used for this model was “Commercial” and the values in the guideline shown
in Table 3.7 and Table 3.8 of the guidelines have been used in this model. Figure 4.1 shows
the MUSIC Model layout for the site.
Bioretention Basins (Biopods) have been placed to treat flows from carparks, existing roads,
proposed villas, entry building and the tank overflows, landscaped areas, and pathways. To
treat the new areas, five biopods have been placed to catch flows draining from the listed areas.
The Biopods range in size from 5 to 15m2 dependent on catchment size. Each biopod has a
filter layer depth of 0.4m and an extended detention depth of 0.2 to 0.3m. The size and depth
of these systems has been designed in accordance with Water by Design guidelines. The bio-
pods drain to the unnamed waterway on site to the east of the proposed development.
Seven (7) Rainwater Tanks have been provided for the roof catchments as shown on Plan No
1714-01. The Reuse allowed is for:
1. Villas – toilets daily re-use – allow 1500 litres / pedestal in accordance with QDC.
2. Some watering of landscaping.
Sizing checks for the five rainwater tanks is detailed in Section 5.0 below.
10
1714-Cartwrigth Village Extension_IWMP_Version2.doc October 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.