Original source · versioned page text
1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
Callaghan & Toth
4.3.2 Assessment of Results
The developed site has been modelled as a series of commercial sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Plan No 1714-01 shows
the proposed locations of the rainwater tanks; detention systems and biopods. The reductions
listed in Section 4.3.1 above comply with Council’s requirements.
13
1714-Cartwrigth Village Extension_IWMP_Version2.doc October 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.