Original source · versioned page text
1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
Civil, Environmental & Hydraulic Engineers [OCR of page images] SCREENED OVERFLOW PIPE TO DETENTION BASIN THEN TO BIORETENTION BASIN SUPPLY OFF TAKE TO TOILET FLUSHING COLD WATER WASHING MACHINE AND LANDSCAPING ROOFWATER DOWNPIPE Ne FIRST FLUSH DIVERSION Zo TO GARDEN BEDS © 20% POTABLE WATER VALVE SHUT OFF LEVEL 10% FLOAT SWITCH/POTABLE WATER VALVE ACTIVATION LEVEL Callaghan & Toth Civil, Environmental & Hydraulic Engineers 8/41 Sunshine Beach Road P.O. Box 2305 | NOOSA HEADS 4567 l Ph: 54749081 = www.callaghanandtoth.com.au project PROPOSED CARTWRIGHT VILLAGE EXTENSION — CARRAMAR location 186 COOROY NOOSA ROAD, TEWANTIN TYPICAL RAINWATER TANK Figure 4.2 ScaleNTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.