7 CONCLUSIONS & RECOMMENDATIONS
The proposed development area can be treated by a treatment train consisting of rainwater
reuse tanks and biopods, which are capable of removing the nutrients and heavy metals.
The car parking and new building can be built to flood free levels in accordance with Council’s
requirements.
A system of detention tunnels (ECOAID) are able to attenuate the runoff concentrations back to
Pre-Development levels and so the development will not have an impact on the hydrology of the
receiving waters.
17
1714-Cartwrigth Village Extension_IWMP_Version2.doc October 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.