Skip to the record
Every meeting, every word.

Original source · versioned page text

1714 IWMP_Report_Carramar_Version2 Oct 2018

Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

                                                                               Callaghan & Toth


7        CONCLUSIONS & RECOMMENDATIONS
The proposed development area can be treated by a treatment train consisting of rainwater
reuse tanks and biopods, which are capable of removing the nutrients and heavy metals.

The car parking and new building can be built to flood free levels in accordance with Council’s
requirements.

A system of detention tunnels (ECOAID) are able to attenuate the runoff concentrations back to
Pre-Development levels and so the development will not have an impact on the hydrology of the
receiving waters.




                                                                                              17
1714-Cartwrigth Village Extension_IWMP_Version2.doc                          October 2018
Log in to download the original file

1714 IWMP_Report_Carramar_Version2 Oct 2018.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.