Original source · versioned page text
1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
List Of Contents
1. Introduction And Summary 3
2. Pre- And Post-Development Runoff Rates By The Rational Method 4
3. Broad-Brush Detention Volume 4
4 Pre- And Post-Development Urbs Models 5
4.1 Model Set-Ups 5
4.2 Comparison To Rational Method Calculations 7
4.3 Detention Volumes 7
5. References 9
List Of Figures
1. Overall Site Plan 2
2. Urbs Model Layout For Pre-Development Scenario 5
3. Urbs Model Layout For Post-Development Scenario 6
4. Conceptual Arrangement Of Detention Volume 8
List Of Tables
1. Comparison of Urbs Outflow Rates To Rational Method Outflow Rates 7
2 Urbs Design Of Attenuation Volume, Regardless Of Critical Durations 7
Appendices
A. EcoAid Brochure 12
B. Urbs catchment File, Pre-Development Scenario 23
C. Urbs Catchment File, Post-Development Scenario 26
Page 2
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.