Skip to the record
Beware of cheap imitations.

Original source · versioned page text

1714 IWMP_Report_Carramar_Version2 Oct 2018

Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

List Of Contents

1.      Introduction And Summary                                                  3

2.      Pre- And Post-Development Runoff Rates By The Rational Method             4

3.      Broad-Brush Detention Volume                                              4

4       Pre- And Post-Development Urbs Models                                     5
4.1     Model Set-Ups                                                             5
4.2     Comparison To Rational Method Calculations                                7
4.3     Detention Volumes                                                         7

5.      References                                                                9


List Of Figures

1.      Overall Site Plan                                                         2
2.      Urbs Model Layout For Pre-Development Scenario                            5
3.      Urbs Model Layout For Post-Development Scenario                           6
4.      Conceptual Arrangement Of Detention Volume                                8


List Of Tables

1.      Comparison of Urbs Outflow Rates To Rational Method Outflow Rates         7
2       Urbs Design Of Attenuation Volume, Regardless Of Critical Durations       7


Appendices

A.      EcoAid Brochure                                                          12
B.      Urbs catchment File, Pre-Development Scenario                            23
C.      Urbs Catchment File, Post-Development Scenario                           26




                                                                              Page 2
      Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
Log in to download the original file

1714 IWMP_Report_Carramar_Version2 Oct 2018.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.