Original source · versioned page text
1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
The model set-up for the post-development scenario is shown in Figure 3, below.. The model structure
has 17 subareas. Subareas 1 to 12 represent areas other than the proposed roofs, whereas subareas 13 to
17 represent the proposed roofs. The runoff volumes from subareas 13 to 17 are conceptually lumped
together before passing through a single conceptual detention volume, before being conjoined with the
sum of the runoffs from subareas 1 to 13.
The corresponding coding of the Urbs catchment file for this post-development scenario can be seen in
Appendix C hereto.
NORTH
1
13 14
3
VILLA 4 VILLA 3
2
0 SCALE 50 m
4 5
STORMWATER CATCHMENT BDY
FOR PROPOSED EXTENSION
6
DB OUT
7
15
ENTRY LANDSCAPED
PODIUM
8
9
17
16 10
11 VILLA 2
VILLA 1
12
COOROY - NOOSA ROAD
Figure 3: URBS Model Layout For Post-Development Scenario
The pre-development and post-development models shared the same operating parameters – namely, an
alpha parameter of 2.0 and an m parameter of 0.80, with reach factor lengths varying from 1.9 to 2.5 in
Page 6
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.