1714 IWMP_Report_Carramar_Version2 Oct 2018
Attached to the e-mail Revised Integrated Water Management Plan (Representations) MCU18/0009.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
In summary, the modelling has suggested a minimum 100 year detention volume of 92 cubic metres, or
maybe as much as 124 cubic metres if like-for-like storm durations are considered to be a vital
requirement. Both of these volumes are reasonably consistent with the broad-brush estimate of 117
cubic metres at the bottom of page 4 of this report. A nominal volume of 110 cubic metres was
therefore adopted, on the basis that the use of the latest infiltration allowances and temporal patterns at
the detailed design stage will most likely result in a slight reduction in the required detention volume,
albeit at the expense of substantially greater design complexity..
The 110 cubic metre volume was then simply apportioned between the two groups of roof areas, on the
basis of contributing roof area as a proportion of total roof area, resulting in the conceptual arrangement
shown in Figure 4 below. This provides a total of 110 cubic metres, using the ecoAID underground
cellular system. Details of this system are shown in the brochure in Appendix A hereto.
NORTH RW
VILLA 4 VILLA 3
0 SCALE 50 m ecoAID SYSTEM
5 ROWS x 12 UNITS
DET VOL 48 m3
B4
ecoAID SYSTEM
7 ROWS x 11 UNITS B4
DET VOL 62 m3
RW
ENTRY LANDSCAPED
PODIUM
VILLA 1 VILLA 2
COOROY - NOOSA ROAD
Figure 4: Conceptual Arrangement Of Detention Volume
Page 8
Brisbane Stormwater Management Pty Ltd Document File: Carramar.Doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.