6. Please indicate on the plans the width and shape of the vehicle crossover in the
Elizabeth Street road reserve and any services or vegetation that may be affect
by the construction of the crossover. Please indicate on the plans the applicable
Council Standard Drawing number.
7. Please indicate on the plans the dimensions of the proposed access driveway
and carspaces and the setback distance from the boundary for the edge of the
access driveway.
8. Please demonstrate that vehicles can access each proposed carspace in a
forward gear, reverse out and exit the site in a forward gear in a total of three
movements.
9. Please demonstrate how the current proposal complies with condition 19 of the
Order No. D366 of 2004 dated 31 March 2005.
10. Please indicate on the relevant plans the concrete footpath in Elizabeth Street as
described in condition 23 of the Order No. D366 of 2004 dated 31 March 2005.
11. Please demonstrate how stormwater runoff from the driveway collected in the
driveway pits is treated in accordance with condition 28 of the Order No. D366 of
2004 dated 31 March 2005.
12. Please provide the detailed maintenance plan for the grease/oil treatment pit
accordance with condition 28 of the Order No. D366 of 2004 dated 31 March
2005.
13. Please demonstrate how the current proposal complies with condition 36 of the
Order No. D366 of 2004 dated 31 March 2005. Detailed site surveys indicating
natural surface levels and contours of the adjoining properties must be provided
to indicate if any additional ponding will occur on the adjoining properties due to
the filling of the subject site. If additional ponding does occur the applicant is
required to design and construct a drainage system and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a
design storm with an Average Recurrence Interval of 1 in 100 years. A private
easement for the Drainage of Water encompassing the drainage pipes or
overland flow-path will also be required. Should evidence be provided to Council
indicating that no additional ponding of stormwater will occur on the adjoining
properties the requirement for the drainage pipes, overland flow-path and
easement shall not apply.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Pursuant to the conditions of the Development Permit for a Material Change of Use
please note that all bonds and contributions are required to be paid prior to the issue of
the Operational Works approval.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A782.001.pdfRelated documentPublic source context ↗
Request for Further Information - 010.2007.00000836.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11 KB (small file)
- File type
No other editions are linked here.