Original source · versioned page text
DA Form 1
Attached to the e-mail Lodgement of development application - 60 and 68 Gradys Lane_ Kin Kin.
6.3) Additional aspects of development
☐ Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
☒ Not required
6.4) Is the application for State facilitated development?
☐ Yes - Has a notice of declaration been given by the Minister?
☒ No
Section 2 – Further development details
7) Does the proposed development application involve any of the following?
Material change of use ☐ Yes – complete division 1 if assessable against a local planning instrument
Reconfiguring a lot ☒ Yes – complete division 2
Operational work ☐ Yes – complete division 3
Building work ☐ Yes – complete DA Form 2 – Building work details
Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
8.2) Does the proposed use involve the use of existing buildings on the premises?
☐ Yes
☐ No
8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
☐ Yes – provide details below or include details in a schedule to this development application
☐ No
Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
2
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
☐ Subdivision (complete 10) ☐ Dividing land into parts by agreement (complete 11)
☒ Boundary realignment (complete 12) ☐ Creating or changing an easement giving access to a lot
from a constructed road (complete 13)