Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Reference Document - RAL23/0013.02 - Part 2 (As Published)

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Commercial in Confidence
This document is commercial-in-confidence. The recipient of this document agrees to hold all information presented
within as confidential and agree not to use or disclose or allow to use or disclosure of the said information to
unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the presentation or at any time
before, during or after an agreement has been reached, without prior written consent.

This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No responsibility is accepted
for the use of or reliance upon this report in whole or in part by any third party.




Limitations
The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is to display
information in accordance with the scope of services set out in the contract/quotation between Colliers | Engineering &
Design and its client. The scope of works and services were defined by the requests of the client, by the time and
budgetary constraints imposed by the client, and by the availability of access to site/s and information.

This report is prepared with information supplied by the client and possibly others which is presumed to be accurate and
complete. No responsibility is accepted for information that is withheld, incorrect or that is inaccurate, nor for changes
to the conditions over the passage of time or from latent circumstance or conditions. No warranty or guarantee is made
in relation to the data, findings and conclusions expressed in this report.

This report has been compiled at the level of detail specified in the report and no responsibility is accepted for
interpretations made at more detailed levels than so indicated.



Report Contact:

 Name:               Lochlan Gillis
 Position            Senior Water Resources Engineer
 Phone:              (07) 3532 1300




Document Control
21-0352FSMP02-V3

 Version         Date           Details        Prepared         Checked         Approved          Signed             RPEQ

     1        18/07/2023         Issue           BB / LG            LG                KM                             09298

     2        06/10/2023         Issue             LG              KM                 KM                             09298

     3        15/11/2023         Issue             LG              KM                 KM                             09298




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                              Page i
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.