Reference Document - RAL23/0013.02 - Part 2 (As Published)

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

1.3.       Request for Information
An information request from Noosa Council, dated 15 August 2023, requested further information on the
development application (RAL23/0013). Items relevant to the Flood Investigation and Stormwater
Management Plan are listed below together with the relevant response(s).



Item 10: Issue – Earthworks
Section 2.2.1 of Collier’s Flood and Stormwater Plan proposes the following:

    a.   A drain at a depth of 0.4m in a 3-metre-wide easement; and
    b.   1,250m of cut at a depth of 0.1m.

Insufficient information has been provided demonstrating the location and extent of these works. Any works that
is located outside of the subject site (33 Pavilion Street) must be supported with the landowners’ written consent.

Response:

The earthworks (drain in 3mtr easement, and 1250m3 cut) are part of 25 Pavilion works and have been
constructed.

Section 2.2.1 of the SMP has been updated to show the works as “existing” to clarify this point.



Item 11
Provide additional detail demonstrating the location and extent of the works proposed in Section 2.2.1 of Collier’s
Flood and Stormwater Plan. The additional detail must be prepared by a suitably qualified person (RPEQ –
Registered Professional Engineer of Queensland) and include, but not be limited to:

    a.   details of the proposed stormwater drain and easement (location, grades, lots benefitted and burdened);
         and
    b.   where works are located outside of the subject site (33 Pavilion Street), provide all respective landowners’
         written consent.

Response:

The stormwater drain and easement are not proposed works. They are existing works as part of adjoining
application 25 Pavilion. Section 2.2.1 SMP has been updated to clarify this point.



Item: Flood impact assessment
The submitted Flood and Stormwater Plan prepared by Colliers includes aerial imagery that does not reflect the
recent subdivision at 25 Pavilion Street (now Majestic Drive). It is unclear to Council if survey data reflecting the
newly completed works has been used in conjunction with Lidar to provide an accurate assessment of the
proposed flood and afflux mapping. Council is concerned that the proposed earthworks may adversely affect the
flood characteristics of external sites.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                     Page 9
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.