Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Reference Document - RAL23/0013.02 - Part 2 (As Published)

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

         In addition, the magnitude of the increases (change) in non-critical durations (pre-post) still remain
         orders of magnitude below the 1% AEP peak flow for the regional event. For example, the 1% AEP
         peak flow in the regional event is in the order of 300 m3/s and the greatest change across
         equivalent duration within an AEP event is 0.22 m3/s, (approximately 0.07% of the regional 1% AEP
         flow). Based on guidance provided in the Flooding and Stormwater Management
         Guidelines (Sunshine Coast Council, 2020) policy this is argued to be an acceptable difference.
         Therefore, the change in non-critical durations is considered not to be of any significant
         consequence within the context of the overland flow path and will not results in nuisance or
         damage the downstream property.

         Based on the above, and that the proposed solution provides an improved performance outcome
         above the current approved basin, it is considered that the proposed detention basin meets the
         performance objectives of the Noosa Planning Scheme, the intent of the QUDM guidelines and is
         analysed using ARR2019 methodology. As such it is considered that the basin design is sufficient to
         meet the approval criteria of the application.




         Figure 1-4: Moderate Flood Extent (Source: Noosa Council Disaster Mapping)


    d)   Across some storm durations there is a minor difference in flow rates above existing. These
         differences are largely unobservable above 90 min, and resolved once the duration is greater than
         270 min (4.5 hours):
    e)   Differences between external catchments have been corrected in Table 2-1 to reflect the existing
         scenario WBNM model. There is no difference in the external catchment size modelled for the
         existing and developed scenarios.
         Differences between SUB3 and SUB4 reported in SMP are correct. This is due to grading within the
         site adjusting catchment delineation. Refer to Figure 2-1 and Figure 2-2 for details.
         The difference in catchment delineation between existing and developed scenarios does not
         materially change the results of the model. This is because SUB3 is routed to SUB4, which connects
         to the model outlet “SINK” in the existing scenario, bypassing sub-catchments SUB1 and SUB2. In
         the proposed scenario SUB3 is routed to SUB1, where the basin structure is located, in alignment
         with the engineering drawings for the proposed development (Appendix A). Refer Table 2-1 and
         Table 2-5 for model routing.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                              Page 16
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.