Reference Document - RAL23/0013.02 - Part 2 (As Published)

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 30, section 1. The text section number identifies this passage in the reader.

Table 2-4: External catchment overland flow (entering site) and pipe flow (diverted around site via Pavilion St)

               Flow                10% AEP              5% AEP                 2% AEP              1% AEP                 1% CC AEP
                            Area        Flow         Area       Flow        Area     Flow      Area          Flow      Area      Flow
                            (ha)       (m3/s)        (ha)      (m3/s)       (ha)    (m3/s)     (ha)         (m3/s)     (ha)     (m3/s)
            TOTAL           1.960       0.437        1.960     0.534        1.960   0.671      1.960        0.768     1.960     0.982

   EX2      Overland           -          -          0.300     0.097        0.618   0.234      0.782        0.331     1.032     0.545

            Pipe                        0.437                  0.437                0.437                   0.437               0.437
            TOTAL           0.287       0.165        0.287     0.093        0.287   0.114      0.287        0.130     0.287     0.165

   EX1      Overland           -          -          0.049     0.018        0.093   0.039      0.116        0.055     0.152     0.091

            Pipe flow                   0.075                  0.075                0.075                   0.075               0.075



Table 2-5: Summary of Developed Catchment Parameters

   Sub-catchment                   Downstream                  Area (ha)                  Imperviousness (%)
                                    Catchment
           Ex2                         SUB3                         1.960                              50
           Ex1                         SUB1                         0.287                              50
          SUB3                         SUB2                         1.780                              50
          SUB1                         SUB2                         2.079                              50
          SUB2                         SUB4                         1.354                              5
          SUB4                         SINK                         0.819                              5


    Ex1 (<10% AEP)                                                  0.0*                               -
     Ex1 (5% AEP)                                               0.049*                                 50
     Ex1 (2% AEP)                                               0.093*                                 50
     Ex1 (1% AEP)                                               0.116*                                 50
   Ex1 (1% AEP CC)                                              0.152*                                 50
    Ex2 (<10% AEP)                                                  0.0*                               -
     Ex2 (5% AEP)                                               0.300*                                 50
     Ex2 (2% AEP)                                               0.618*                                 50
     Ex2 (1% AEP)                                               0.782*                                 50
   Ex2 (1% AEP CC)                                              1.032*                                 50
* area factored based on flow rate for events greater than 10% AEP

The increased imperviousness and changes to catchment areas associated with the development resulted
in an increase in peak flows to the sites outlet as shown in Table 2-6. Mitigation will be required to ensure
non-worsening downstream and satisfy the lawful point of discharge requirements.

Table 2-6: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed)

      Event AEP             63.20%            50%            20%            10%         5%            2%             1%        1%CC
   Existing (m3/s)            0.33            0.43           0.72           0.92        1.21        1.55             1.86       2.57
 Developed (m3/s)             0.34            0.43           0.73           0.94        1.25        1.66             2.04       2.63
   Change (m3/s)              0.01            0.00           0.01           0.02        0.04        0.11             0.18       0.06




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                                      Page 22
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.