Original source · versioned page text
Reference Document - RAL23/0013.02 - Part 2 (As Published)
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
Figure 3-1: WSUD Catchment Locality Plan 3.2.4. MUSIC Model Layout As the management of urban stormwater needs to take a holistic approach, specific management measures need to be implemented in series to form a treatment train. The correct utilisation of various devices within the treatment train is imperative to target the desired pollutants, from the gross solids to the fine colloidal partials. Figure 3-2 shows the MUSIC model layout for the development. 23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.