Skip to the record
Accept no substitutions.

Original source · versioned page text

Reference Document - RAL23/0013.02 - Part 2 (As Published)

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

Figure 3-1: WSUD Catchment Locality Plan



3.2.4.     MUSIC Model Layout
As the management of urban stormwater needs to take a holistic approach, specific management
measures need to be implemented in series to form a treatment train. The correct utilisation of various
devices within the treatment train is imperative to target the desired pollutants, from the gross solids to the
fine colloidal partials. Figure 3-2 shows the MUSIC model layout for the development.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                             Page 31
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.