Original source · versioned page text
Reference Document - RAL23/0013.02 - Part 2 (As Published)
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
6. CONCLUSION Colliers Engineering and Design have been engaged by PSP Developments Pty Ltd to prepare a Stormwater Management Plan (SMP) in support of a development application to Noosa Shire Council (NSC) over land located at 33 Pavilion Street, Pomona (Lot 4 RP809059). This development application seeks a development permit for a Reconfiguration a Lot (ROL) to create 8 residential lots. The site has an existing building at Lot 1 and no works are required to create lot 1. It can be seen from the results, presented in Table 3-7 that the treatment measures proposed for the development site achieve the performance criteria set by the NSC Planning Scheme (2020) and SPP (July 2017). Annual Load Reductions of Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen (TN) and Gross Pollutants (GP) between the Mitigated and Unmitigated Scenarios have been achieved through the upgrade of the existing bioretention basin from 80m2 to 130m2. It has been demonstrated that non-worsening of peak flows has been achieved to the discharge point for events up to the 1% AEP event (refer Table 2-8). The results show that there is non-worsening for events up the 1% AEP. The intent of sizing the detention basin is to mitigate flows up to the 10% AEP storm event to ensure non-worsening of discharges into the downstream flow path. In larger events, flows from the site will start to sheet flow across the rear of the site to Cooroora Creek. As the discharge point for the site becomes inundated from Cooroora Creek flooding in the major storm event, it is considered non-worsening has been achieved. The catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha and it is considered that no quantifiable change to downstream flooding conditions would result. This plan demonstrates that effective treatment of stormwater at the proposed development can be achieved through the integration of Water Sensitive Urban Design (WSUD) principles. Through the incorporation of bioretention basins, the plan successfully demonstrates: Compliance with the requirements of the NSC Planning Scheme and SPPs Load Based Objectives; The end of line bioretention basin is upgraded to 130m2 to cater for the proposed development. Ecological sustainability in terms of the development’s impact upon receiving waters and the viability of the proposed site development. Non-worsening of peak flows is achieved through the upgrade of the existing basin. The development is located above the regional 1% (2100 AEP flood extent with 500mm freeboard recommended to future dwellings on the new allotments. We therefore request Council approval of the engineering components for the proposed development with reasonable and relevant conditions. Detailed design may result in changes to the proposed strategy; however, the design objectives will be maintained. 23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 37
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.