Original source · versioned page text
Reference Document - RAL23/0013.02 - Part 2 (As Published)
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
MAJESTI
REFER DRAWING 23539-SK101 FOR CONTINUATION
2 3 4 6 7
R
3m WIDE CONC. ACCESS FOR LOT 5
E
W
89
E
LEGEND
S
EXISTING CONTOURS (0.5m INTERVALS)
R
89 INTERIM 1.5m STORMWATER EASEMENT (STAGE 1) PROPOSED CONTOURS (0.5m INTERVALS)
89
TO BE EXTINGUISHED IN STAGE 2
E
EXISTING KERB & CHANNEL
EXISTING DRAINAGE
R
90 S EXISTING SEWER
W
S
COMBINED RETAINING WALL / BATTER INTERFACE TO OPTIMISE W EXISTING WATER
E
8 LOT USAGE AND CONTAIN WORKS WITHIN THE SUBJECT LOT.
PROPOSED KERB & CHANNEL
90 SP324164 FINAL CONFIGURATION TO BE DETERMINED DURING OPW PHASE.
NOM
R
PROPOSED STORMWATER DRAINAGE
1:4
NOM
90
1:4
W
S
R PROPOSED ROOFWATER DRAINAGE
E
H0.0
H1.4
S PROPOSED SEWER
91 W PROPOSED WATER
R
PROVIDE DN150 STUB TO THE BOUNDARY TO
1:3* MAX
C PROPOSED TOP OF BATTER
VARIES
W
S
AFFORD #35 PAVILION STREET PROVISION FOR
E
91 SK103 PROPOSED TOE OF BATTER
ROOFWATER CONNECTION. FUTURE PIT BY OTHERS.
NOM
NOM
91
1:3
1:3
PROPOSED RETAINING WALL
R
W H1.0 PROPOSED RETAINING WALL HEIGHT
E
S
92 PROPOSED ROAD PAVEMENT
SC H0.0 F
R R H1.3 PROPOSED CONCRETE PATHWAY
SC R
R R SK103 PROPOSED CONCRETE DRIVEWAY
S 92 S S S
E
92 S S S PROPOSED EARTHWORKS
W
A VARIES B CUT FILL
R
SK103 SK103
S
93 1:7 MAX
E
BATTER SLOPE MANAGEMENT
W
R
93 < 1 : 4 SLOPES SHALL BE GRASSED
S
93
H0.0 1 : 3 SLOPES SHALL BE PLANTED*
E
H0.0 1 : 2 SLOPES SHALL CONSIST OF LEVEL 1 FILL WITH PLANTING*
1:100
NOM
W
R
* PLANTING DETAILS TO BE DETERMINED DURING OPW PHASE
5
E
94
S
EXISTING (#35)
VARIES
DWELLING TO 3
R
W
94 94 1:4 MAX
BE RETAINED RP809059
NOOSA COUNCIL
1
S
9 REFERENCE DOCUMENT
R
SP324164
W
E
95 RAL23/0013.02 30 MAY 2025
S H1.3
R
95 95
2
E
W
NOM
1:3
LOT 5 RP864877
EXISTING SEWER AND WATER
S
H0.0
R
E
CONNECTIONS SERVICING LOT 1
E
TO BE RETAINED
W
96
PLACE
7m
E
R
S
E
96 96
2
E
W
S S S S S
ENTRY MANOEUVRE 3
E
E
MAJESTIC
PROVIDE DN150 STUB TO THE BOUNDARY TO AFFORD
#29 & #31 PAVILION ST PROVISION FOR ROOFWATER EXIT MANOEUVRE
CONNECTION. FUTURE PITS BY OTHERS.
E
W
97 97
E
W
1
E
LOT 6 LOT 7
EXISTING ACCESS TO LOT 1 TO BE RETAINED
W
LOT 1 ACCESS VEHICLE SWEPT PATH LOT 7 ACCESS VEHICLE SWEPT PATH
E
(#29) (#31) STANDARDS AUSTRALIA B99 VEHICLE SCALE 1:200 STANDARDS AUSTRALIA B99 VEHICLE (FWD-IN : REV-OUT) SCALE 1:200
EMT A RP809059
98 98 6 5
W
(#27A) RP809059 RP809059
E
1 (#37)
RP189023 2 1 4 3
RP809059 RP154922 2
RP864877 RP864877
W
E
CONSTRUCT 4m x 0.9m CONCRETE
BIN PAD IN FAVOUR OF LOTS 6 & 7
W
E
99 99
1
E
W
3
J:\2023\23539SD2_33 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\1.RAL\#23539_CI_RAL.dwg
E
W
100 100
E
E E E E
LOT 4 LOT 5 LOT 6 LOT 7
PAVILION STREET
E
TURNING FACILITY VEHICLE SWEPT PATH
STANDARDS AUSTRALIA MEDIUM RIGID VEHICLE (3-POINT TURN) SCALE 1:200
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
JF JF
This drawing is subject to
copyright in accordance with
SURVEYORS & PLANNERS PSP DEVELOPMENTS P/L 'POMONA 33' : RESIDENTIAL DEVELOPMENT ENGINEERING PLAN 1 : 250 U.N.O. A1
the agreement between TOD LAND SURVEYING DYNAMICS (LSD) Designed Verified
Consulting Pty Ltd (tc) and tc's E 07.04.25 LOT 7 EARTHWORKS JF
p 0412 666 516 JF JF 33 PAVILION ST, POMONA SHEET 2 OF 2 Drawing Number
client. This drawing shall only D 19.12.23 RAL23/0013 PRELIM APPROVAL AMENDMENTS JF
be used for this specific project.
C 17.11.23 RAL23/0013 IR RESPONSE FURTHER ADVICE JF
e [email protected] Approved RPEQ No RP DESCRIPTION 4 / RP809059 23539-SK102
This drawing shall not be used w www.landsurveyingdynamics.com Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 LOCAL AUTHORITY NOOSA COUNCIL
B 06.10.23 RAL23/0013 IR RESPONSE JF MCU APPROVAL - HORIZ DATUM MGA 2020 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 Signed
A 18.07.23 ORIGINAL ISSUE JF [email protected] www.todconsulting.com ROL APPROVAL - VERT DATUM AHD
'Issued For Construction' in the
revision description. Rev Date Revision Description Drawn ABN 39 128 805 336 OPW APPROVAL - RL DATUM - MEASUREMENT BAR - INCREMENTS IN mm E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.