ORDINARY MEETING AGENDA 20 NOVEMBER 2014
Street Identification
9. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
ENGINEERING
Carparking and Driveways
11. Sealed car parking and access driveway must be provided generally in
accordance with Drawing No: S8166 – MS01- Revision (A) titled Master Site
Plan dated 20/08/2014 by Milanovic Neale Consulting Engineers. The works
must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. The car parking must be in compliance with the provisions of the current
AS/NZS 2890.1 off-street car parking (particularly Section 2.4.4) and the
relevant sections of AS/NZS 2890.6 off-street car parking for people with
disabilities.
b. Compliance with the relevant sections of AS/ANZ 2890.2 Off-street
commercial vehicles facilities.
c. Traffic control and directional signage within and at the entry of the site
must be provided in accordance with the design engineer
recommendations and in compliance with the Manual of Uniform Traffic
Control Devices (MUTCD).
12. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times.
13. Any building, structure and/or installation (e.g. sliding gate and associated
mechanism) must not encroach onto, or negate the conditions of, the registered
easement/s along the front boundary of the site.
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval in compliance with the relevant sections of
Queensland Urban Drainage Manual, the relevant Codes and Policies of The
Noosa Plan and supported by a detailed stormwater drainage report and design
based on field survey and prepared and certified by a suitably qualified and
experienced Registered Professional Civil Engineer, and must include in
particular:
a. Where is considered effective and practical all roof runoffs should be
directed to water tanks with overflows and surcharge be discharged into a
lawful point of discharge.
Page 11 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.