Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix C - SPP Checklist

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Matters of State Planning         Type    Relevant to Development /                  Assessment
Interest         Scheme                   Trigger                                    Required
                 Reflects State
                 Interest*

                                         b) medium and high-impact
                                            industry,
                                         c) noxious and hazardous industry,
                                         d) extractive industry,
                                         e) utility installation that involves
                                            sewerage services, drainage or
                                            stormwater services,
                                         f)   waste management facilities, or
                                         g) motor sport facility
                 Yes              ROL     For an urban purpose that involves No
                                          premises 2,500m² or and will result
                                          in 6 or more lots.
                 Yes              ROL     Where located wholly outside an            No
                                          urban area and relating to
                                          premises that is within, or partly
                                          within, a water supply buffer area,
                                          that involves:
                                          Creating 5 or more additional lots if
                                          any resultant lot is less than 16Ha,
                                          and any of the lots created will rely
                                          on on-site wastewater treatment.
                 Yes              OPW     for an urban purpose that involves         No
                                          disturbing a land area 2,500m² or
                                          greater.
Emissions and    Yes              No Assessment Benchmarks
Hazardous
Activities
Natural Hazards, No               MCU     Where in any of the following:             Yes
Risk and         Yes              ROL     (1) bushfire prone areas                   No
Resilience
                                          (2) flood hazard areas
                 Yes              OPW                                                No
                                          (3) landslide hazard areas
                                          (4) storm tide inundation areas
                                          (5) erosion prone area
                                          Note: There are specific assessment
                                          benchmarks which apply for erosion prone

                                                                                                  3
Log in to download the original file

Appendix C - SPP Checklist.pdf · 150 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.