COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Setbacks and easements
O1 S1.1 Can comply
Development near a sewer, water main, The footing of any structure or building is located The footings of the building will be located
stormwater drain, overland flow path or associated clear of the zone of influence but no closer than 1.5m appropriately. The development can be
structure does not (measured horizontally) from infrastructure conditioned appropriately.
a) adversely affect the function of the service; including sewers, water mains and stormwater
b) place an additional load on the service; and structures;
c) unduly increase future maintenance costs. AND
S1.2 Can comply
No building or structure overhangs the zone of The buildings and structures will be designed
influence; appropriately. The development can be
AND conditioned appropriately.
S1.3 Can comply
Finished surface levels maintain a minimum of The development will provide an appropriate level
600mm of cover, but no greater than 3m of cover of cover over underground infrastructure.
to the underground infrastructure;
AND
S1.4 Can comply
If the existing surface level is altered, surface level The development will be alter manholes and
services including manholes and inspection points inspection points, as required.
are altered to match the new surface level;
AND
S1.5 Can comply
Alterations are constructed in accordance with Any alterations will be completed in accordance
Sections 3, 4 and 5 of PSP6 Engineering Design with Council requirements.
Standards Water and Sewerage and Section 4 of
PSP5 Engineering Design Standards Roads,
Drainage and Earthworks;
OR
Existing Services Code Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
S1.6 Can comply
Existing services are relocated and the design and Any existing services which are required to be
construction of the relocated services is in relocated will be completed in accordance with
accordance Sections 3, 4 and 5 of PSP6 Council requirements.
Engineering Design Standards Water and
Sewerage and Section 4 of PSP5 Engineering
Design Standards Roads, Drainage and
Earthworks.
O2 S2.1 Can comply
Maintenance access is provided to all sewers, water A registered easement in favour of Council is Any registered easement required as part of the
mains, stormwater drains, overland flow paths and created over all underground infrastructure located development will be put into place.
associated structures. in private property;
AND
S2.2 Can comply
The width of the easement is the greater of 3m or The development will be of an appropriate width.
the width of the zone of influence;
AND
S2.3 Can comply
The easement is centred over the centreline of the The development will be located appropriately.
infrastructure.
Local amenity
O4 S4.1 Can comply
Earthworks do not cause disturbance to the The following control measures are All necessary control measures will be
amenity of the neighbouring land. implemented implemented to maintain amenity of neighbouring
a) regular water spraying of exposed areas to properties.
suppress dust;
b) provision of dust stabilised or sealed internal
roads;
c) protective covering of exposed areas that are
left for more than 2 weeks; and
d) if there is no valid development permit for the
site, disturbed areas are revegetated using species
identified in PSP3 Landscaping Plants and
Guidelines.
AND
Existing Services Code Page 2
Page 3
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
S4.2 Complies with the Probable Solution
Earthworks are undertaken only during the hours The development can be conditioned
of 7am to 6pm, Monday to Friday and 7am to 6pm appropriately.
on Saturday. No work is undertaken on Sunday or
public holidays.
Vegetative Waste
O5 S5.1 Can comply
Vegetation cleared from a development site is Cleared vegetation is transported offsite for disposal All cleared vegetation will be removed from the
disposed of in an environmentally responsible in an approved green waste disposal facility; site, mulched on site and reused, or disposed for
manner. OR the purposes of firewood.
S5.2
Cleared vegetation is mulched on-site and reused for
landscaping of the finished development;
OR
S5.3
Cleared vegetation is disposed of for the purpose of
firewood.
Managing contamination risk
O6 S6.1 Can comply
Materials used as fill are suitable for development The fill material is solid clean earth, free of Any fill material will be free from contaminants.
of the land and filling or excavation works do not putrescible or refuse material, vegetation, acid
result in the contamination of land. sulfate soils, building or construction material or
other material or contaminants;
AND
S6.2 Can comply
The site is not on the contaminated land register. The site is not on the contaminated land register.
Haulage activity and amenity
O7 S7.1 Complies with the Specific Outcome
Haulage of material to and from a site ensures No solution provided. The development will utilise appropriate roads to
a) minimal disturbance to neighbouring properties haul materials to/from the site.
and properties along the haulage route; and
b) Council s road infrastructure including
pavements is not adversely affected.
Existing Services Code Page 3
Page 4
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Extent of earthworks
O8 S8.1 Complies with the Probable Solution
Earthworks are contained within the subject All earthworks, including cut and fill batters, All earthworks will be contained within the subject
property. retaining walls etc are contained within the subject site.
site.
Environmental protection
O9 S9.1 Complies with the Specific Outcome
Earthworks minimise any adverse impact upon No solution provided. All earthworks will be undertaken to minimise
groundwater, watercourses, drainage lines, wetlands, and impacts on the natural features of the site.
native vegetation.
Dams
O10 S10.1 Complies with the Specific Outcome
Dam location and construction does not impact No solution provided. The proposed bio-retention trench will be
upon neighbouring properties in terms of provided and will not impact on neighbouring
a) hydrology; properties.
b) alteration of existing overland flowpaths and
patterns;
c) landslide or failure of dam wall; and
d) effluent disposal areas.