Original source · versioned page text
Amended Ecological Assessment Report
Very large file: it may take a few minutes
The original of this document is very large (24.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Ecological Assessment Letter
Performance Outcomes Acceptable Outcomes Compliance
AO8.1
PO8 Development on land adjacent to Development adjacent to a waterway or wetland provides that: Not applicable – the development
a waterway or wetland maintains appropriate extent footprint is not adjacent to a
of public access to waterways and wetlands and waterway or wetland
1. no new lots directly back onto a riparian buffer
minimises edge effects.
area; and
2. new public roads are located between a riparian
buffer area or riparian zone and the proposed
development area.
Surface and ground water hydrology
AO9.1
PO9 Development ensures that the natural surface water Development does not impact on the natural surface water or Complies with PO9
and ground water hydrologic regimes of waterways, groundwater hydrologic regimes and this is facilitated by:
wetlands and hydrologically-sensitive plant The proposed dwelling will not
communities are not adversely impacted. impact upon that the natural surface
1. avoiding or minimising channelization, water and ground water hydrologic
Editor's Note—Groundwater dependent ecosystems are redirection or interruption of flow; regimes of waterways, wetlands
identified on Queensland Government Wetland Info 2. avoiding groundwater extraction; and hydrologically-sensitive plant
mapping. 3. maintaining groundwater recharge and communities. The rainforest
discharge processes; understorey vegetation in this
4. maintaining natural groundwater fluctuations; location would be well suited to the
5. avoiding causing ingress of saline water into additional moisture that would be
freshwater aquifers of wetlands; and released in this area.
6. avoiding contaminants entering groundwater
(e.g. from runoff, effluent disposal).
Rehabilitation of ecologically important areas
Development provides for ecologically important AO10.1
PO10 Complies with PO10
areas to be restored and enhanced through: Landscaping and rehabilitation complements and
supports ecologically important areas by: The proposal includes rehabilitation
1. designing landscaped areas to of existing degraded areas on the
complement and enhance 1. utilising local native species; site. A rehabilitation plan has been
existing vegetation and ecological 2. utilising suitable plant species identified included as part of the ecological
linkages; in PSP2 Landscaping; assessment report.
2. removing species likely to displace 3. restoring degraded ecosystems to achieve a
native flora species or degrade fauna functional ecosystem state that requires
habitat; minimal human intervention;
3. replanting and rehabilitating
degraded habitat;
PR22098_EA_36 Riverpark Rd, Ringtail Creek Page 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.