2.3 MAINTENANCE CREW REQUIREMENTS
Table 4 lists the anticipated crew requirements for maintenance operations. Removal of water and sediments
during major maintenance activities can be accomplished using either a pump and water truck or a vacuum
truck. All applicable safety (OH & S) and disposal regulations should be followed. A general description of the
maintenance activities follows.
Table 4: ANTICIPATED CREW REQUIREMENTS
Inspection/Minor Major Maintenance: Major Maintenance:
Maintenance Sediment Removal Cartridge Replacement
Labourer 1 1
Skilled Worker 1 1 1
Vacuum/Water Truck Operator 1 0/1
Total 2* 2* 2/3*
Special Requirements Knowledge of Knowledge of Knowledge of
Proper StormFilter Disposal Cartridge Removal and
Function Requirements Installation Procedures
* May require OH & S trained person if/when vault entry occurs.
2.4 MAINTENANCE METHODS
2.4.1 Minor Maintenance/Inspection (Twice A Year)
Minor maintenance typically will involve the steps below, however if it appears that a spill of some type has
occurred, the local hazard control agency and Stormwater360 should be notified immediately. In the case of a
spill, the worker should abort maintenance activities until the proper guidance has been obtained.
Steps for Minor Maintenance
1. Maintenance to be performed by a skilled worker familiar with StormFilter units.
2. If applicable, set up safety equipment to protect pedestrians from fall hazards presented by open
doors. Also set up appropriate safety equipment for work near roadways.
3. Inspect the external condition of the unit and take notes concerning defects/problems.
4. Open the doors to the vault and allow the system to air out for 5-10 minutes.
5. Without entering the vault, inspect the inside of the unit, including components.
6. Take notes about the external and internal condition. This includes inspecting pit penetrations, walls,
lids, ladders & grates etc.
7. Give particular attention to recording the level of sediment build-up on the floor of the vault in the
forebay (or pre-treatment bay), and on top of the internal components. If flow is occurring, note the
level of water and estimate the flow rate per drainage pipe. Record all observations.
8. Remove large loose debris and trash using a pole with a grapple or net on the end.
9. Close and fasten the door, and remove safety equipment.
©2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.