Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU16/0012 Attach B Engineering report & SMP

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 104, section 1. The text section number identifies this passage in the reader.

properly maintained. The maintenance/repair of upstream facilities should be carried out prior to StormFilter
maintenance activities. In addition to considering upstream facilities, it is also important to correct any
problems identified in the drainage area. Drainage area concerns may include: erosion problems, heavy oil
and grease loading, and discharges of inappropriate materials.


2.5    TYPICAL EQUIPMENT REQUIRED FOR MAINTENANCE ACTIVITIES

Typical equipment required for conducting maintenance is shown in Table 5. Some of the materials listed are
suggestions rather than requirements. It should be noted that there is more than one way to accomplish
some tasks. Owners with available labour and equipment resources may desire to use alternative methods.
However, it is advisable that guidance from Stormwater360 be obtained prior to using alternative techniques.




©2011 Stormwater360
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.