                                                                                                              ENG
                                                  Engineering Report & Stormwater Management Plan
                                          Date:          24/06/2016     Document No.:     15087-ENG-01.Docx

                                           By:              MRS          Revision No.:              C


Appendix G - Stormwater Pipe and Gully Calculations
The proposed building is to be constructed over the existing overland flow path. It is therefore
proposed that the stormwater captured in Garnet Street is conveyed to Wimmer’s Lane via a pipe
with a Q100 capacity.

The proposed upstream site stormwater catchment calculated from Department of
Infrastructure, Local Government and Planning (DGILP) SPP Interactive Mapping as 3.1ha. Refer
to Figure 1 below.




                     Figure 1 Upstream site stormwater catchment
The Q100 flow associated with this catchment with a time of concentration calculated as 13
minutes is 1886l/s (Refer to attached calculation spreadsheet).

Based on the upstream flow of 1886l/s, it is proposed to reroute a 750dia pipe, of 2100l/s
capacity, around the basement of the proposed development between Garnet Street and
Wimmer’s Lane. This capacity was calculated using a 1:33 slope (3600mm fall over 120m length
of pipe) and the catchment area and IFD rainfall data shown in the attached spreadsheet.

The existing pipe connected to the gully pit in front of the site is of 525dia and with a capacity of
1176l/s. This results in an excess flow of (1886-1176) 710l/s which will occur as overland flow in
Garnet Street and needs to be picked up in the sag gully.

From the Brisbane City Council hydraulic capture chart (BSD-8078), 2x3600 lintels with a 150mm
depth at invert level, each with Type A gullies installed in lip-in-line sag configuration will have an
inlet capacity of 355x2 = 710l/s. We acknowledge that the chart used is sourced from another
local government. However, for preliminary sizing of the inlet gullies it is considered to be
appropriate and we will gladly adopt any referenced material from the Noosa Shire Council for
detailed design.
All methodologies and calculations to be adopted to be verified at detailed design stage.

A PO Box 26, Carina Q 4152                                                                   22 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.