MCU16/0012 Attach B Engineering report & SMP
Original PDF page 111, section 1. The text section number identifies this passage in the reader.
ENG
Engineering Report & Stormwater Management Plan
Date: 24/06/2016 Document No.: 15087-ENG-01.Docx
By: MRS Revision No.: C
Appendix G - Stormwater Pipe and Gully Calculations
The proposed building is to be constructed over the existing overland flow path. It is therefore
proposed that the stormwater captured in Garnet Street is conveyed to Wimmer’s Lane via a pipe
with a Q100 capacity.
The proposed upstream site stormwater catchment calculated from Department of
Infrastructure, Local Government and Planning (DGILP) SPP Interactive Mapping as 3.1ha. Refer
to Figure 1 below.
Figure 1 Upstream site stormwater catchment
The Q100 flow associated with this catchment with a time of concentration calculated as 13
minutes is 1886l/s (Refer to attached calculation spreadsheet).
Based on the upstream flow of 1886l/s, it is proposed to reroute a 750dia pipe, of 2100l/s
capacity, around the basement of the proposed development between Garnet Street and
Wimmer’s Lane. This capacity was calculated using a 1:33 slope (3600mm fall over 120m length
of pipe) and the catchment area and IFD rainfall data shown in the attached spreadsheet.
The existing pipe connected to the gully pit in front of the site is of 525dia and with a capacity of
1176l/s. This results in an excess flow of (1886-1176) 710l/s which will occur as overland flow in
Garnet Street and needs to be picked up in the sag gully.
From the Brisbane City Council hydraulic capture chart (BSD-8078), 2x3600 lintels with a 150mm
depth at invert level, each with Type A gullies installed in lip-in-line sag configuration will have an
inlet capacity of 355x2 = 710l/s. We acknowledge that the chart used is sourced from another
local government. However, for preliminary sizing of the inlet gullies it is considered to be
appropriate and we will gladly adopt any referenced material from the Noosa Shire Council for
detailed design.
All methodologies and calculations to be adopted to be verified at detailed design stage.
A PO Box 26, Carina Q 4152 22 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.