                                    3 Garnet Street Cooroy, QLD 4563
                                                       Earthworks Code



Earthworks Code
Specific Outcomes                           Acceptable Solutions/Probable Solutions              Compliance
Local amenity                               S4.1 The following control measures are              The proposed development works
O4 Earthworks do not cause disturbance to   implemented—                                         will comply with this requirement
the amenity of the neighbouring land.       a) regular water spraying of exposed areas to        and will incorporate erosion and
                                            suppress dust;                                       sediment control measures as
                                            b) provision of dust stabilised or sealed internal   shown on the preliminary civil
                                            roads;                                               engineering design drawings.
                                            c) protective covering of exposed areas that are
                                            left for more than 2 weeks; and
                                            d) if there is no valid development permit for the
                                            site, disturbed areas are revegetated using
                                            species identified in PSP3 - Landscaping Plants
                                            and Guidelines;
                                            AND


                                            S4.2 Earthworks are undertaken only during the       The proposed development works
                                            hours of 7am to 6pm, Monday to Friday and            will comply with this requirement.
                                            7am to 6pm on Saturday. No work is undertaken
                                            on Sunday or public holidays.
Vegetative Waste                            S5.1 Cleared vegetation is transported off-site      The proposed development works
O5 Vegetation cleared from a development    for disposal in an approved green waste disposal     will comply with this requirement.
site is disposed of in an environmentally   facility;
responsible manner.                         OR
                                            S5.2 Cleared vegetation is mulched on-site and
                                            reused for landscaping of the finished
                                            development;
                                            OR
                                            S5.3 Cleared vegetation is disposed of for the
                                            purpose of firewood. (Note: Disposal of
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.