Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU16/0012 Attach B Engineering report & SMP

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 44, section 1. The text section number identifies this passage in the reader.

Purpose
The purpose of this manual is to indicate the safest and most efficient method in installing the EnviroPod units.

Personal Protective Equipment
The following personal protective equipment is required by staff for installation activities:
   High visibility vest or shirt
   Safety Footwear (Steel cap toe)
   Gloves (leather palmed riggers gloves or similar)
   Safety eyewear whilst drilling, hammering, cutting T section struts and installing tops and cages.
   Hearing protection for drilling, cutting using electric or battery saws and hammering.

Note: Personnel on construction and private sites must also adhere to the specific safety requirements of each
work site.

Tools Required For Installation
    1. Tape measure
    2. Marking Template
    3. Marking spray paint
    4. 8mm masonry drill
    5. 5 mm steel drill
    6. Pop Riveter for 4.8mm rivets
    7. Hammer
    8. Stanley knife
    9. Straight edge
    10. 10mm socket and ratchet
    11. Hacksaw

Pre-Installation Works (to be completed by others)
1. Gully pits shall be clean prior to installation by either a “Gully sucker” or manual methods.
2. All solidified material and debris within the gully pit shall be broken-out and removed.
3. Cleaning shall be carried out up to 1 week immediately prior to installation.
4. Any standing water shall be removed from the gully pit.
5. Any pipe penetrations within the gully pit must cut off flush with pit walls and rendered prior to installation.

Installation
The aim of all EnviroPod installations is to install the largest unit into each pit, without influencing the
hydraulic performance of the pit or drainage system. To provide clarification on certain aspects of the
installation the following tolerances are included:




©2013 Stormwater360 | EnviroPod Installation Manual                                                               2
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.