Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU16/0012 Attach B Engineering report & SMP

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 49, section 1. The text section number identifies this passage in the reader.

    4. Slide the Top Section along the T Sections until it sits in the center of the pit.




    5. Check unit to ensure a good fit with pit, if the unit does not make a good fit, and that any gaps are less
       than 15mm. If the gaps are larger than 15mm the plastic will need to be replaced by a larger section.

    6. On each strut drill a 5mm hole through the Top Section and the T Struts, and secure the Top Section to
       the struts using a 73AS6-8 pop rivet. NOTE: if the EnviroPod incorporates a cage, step 6 can be
       completed during stage 2 of “Cage Installation”.




    7. Check plastic to ensure that it is bent upwards on all sides, adjusting plastic if required, fill small gaps
       with silicon sealant if required.




©2013 Stormwater360 | EnviroPod Installation Manual                                                                   7
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.