Original source · versioned page text
MCU16/0012 Attach B Engineering report & SMP
Original PDF page 51, section 1. The text section number identifies this passage in the reader.
Bag Installation
1. Thread the filter bag onto the stainless steel support ring.
2. Lower the bag into the pit ensuring that the lifting loops at the base of the bag or on the outside.
3. Pull the internal filter mesh downwards to ensure a secure fit with the top section.
©2013 Stormwater360 | EnviroPod Installation Manual 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.