Original source · versioned page text
MCU16/0012 Attach B Engineering report & SMP
Original PDF page 67, section 1. The text section number identifies this passage in the reader.
10. Check the filter bag. (See Section 3.5)
11. Check the Enviropod unit. (See Section 3.4)
12. Reinstate filter bag, enuring bag is installed the correct way. (See Plate 25 and
Plate 26)
13. Reinstate gully pit lids. (See Plate 27 and Plate 28)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.