Original source · versioned page text
MCU16/0012 Attach B Engineering report & SMP
Original PDF page 78, section 1. The text section number identifies this passage in the reader.
Client: __ ___________________________________________________
Contact: ________________________ Phone: ______________ _
Engineer: _____________________________ __ _
Contact: ____________________ ____ Phone:__________________ _
Address of Device: ___________________________________________ _
Items: SFEP Treatment Train
1
1
2
Frequency of Inspections and Maintenance:
Inspections (time/year) Major Maintenance
EnviroPods 2 (and after major storm) 3-4 months
StormFilters 1 (after 25mm rain event) 12 months
Maintenance Estimate Annual Cost:
StormFilters:
Enviropods:
©2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.