Skip to the record
Beware of cheap imitations.

Original source · versioned page text

MCU16/0012 Attach B Engineering report & SMP

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 78, section 1. The text section number identifies this passage in the reader.

Client: __ ___________________________________________________

Contact: ________________________ Phone: ______________       _


Engineer: _____________________________ __      _

Contact: ____________________ ____ Phone:__________________   _

Address of Device: ___________________________________________ _


Items: SFEP Treatment Train
1
1
2


Frequency of Inspections and Maintenance:
                                Inspections (time/year)            Major Maintenance
EnviroPods                     2 (and after major storm)              3-4 months
StormFilters                   1 (after 25mm rain event)               12 months


Maintenance Estimate Annual Cost:
StormFilters:

Enviropods:




©2011 Stormwater360
Log in to download the original file

MCU16_0012 Attach B Engineering report & SMP.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.