MCU16/0012 Attach B Engineering report & SMP
Original PDF page 98, section 1. The text section number identifies this passage in the reader.
SECTION 2
RECOMMENDED MAINTENANCE AND EXPECTED PERFORMANCE
2.1 TYPES OF MAINTENANCE
Presently, procedures have been developed for two levels of maintenance: Inspection/minor maintenance
and major maintenance. Inspection/minor maintenance activities are combined since the minor maintenance
does not require special equipment and typically little or no materials are in need of disposal.
Inspection/minor maintenance typically involves opening the flow restricting valves (to pre-set levels) and
cleanup of vegetation and debris. Major maintenance typically includes cartridge recharging. Major
maintenance may involve disposal of materials that require consideration of regulatory guidelines. Depending
on the particular unit configuration and equipment used, major maintenance may require an understanding of
OSHA rules. Table 1 summarizes the primary activities associated with StormFilter maintenance.
Table 1: StormFilter
Facility Component Maintenance When Maintenance Activity Expected Facility Performance
Requiring Maintenance Activity Is Required After Maintaining
StormFilter Cartridges and Trash and Debris Removal Floatable objects or other trash is Permanent removal from storm
Containment Structure present in the filter. Remove to avoid system.
hindrance of filtration and eliminate
unsightly debris and trash.
Cartridge Replacement and 1. Media has been contaminated by 1. New media is able to effectively
Sediment Removal high levels of pollutants, such as after a treat stormwater.
spill.
Drainage System Piping Flushing With Water Drainage system is obstructed by debris Outflow is not restricted.
or sediment.
2.2 MAINTENANCE ACTIVITIES
2.2.1 Maintenance Activity Timing
Two scheduled inspections/maintenance activities should take place during the year. During the minor
maintenance activities (routine inspection, debris removal), the type of major maintenance required is
determined and, if required for disposal, samples of the sediments and media are obtained. The next
scheduled date is to perform major maintenance activities (replacement of the filter cartridges and associated
sediment removal). In addition to the scheduled activities, it is important to check the condition of the filter
after major storms to check for damage caused by high flows and to check for high sediment accumulation,
which may be caused by localised erosion in the drainage area. It may be necessary to adjust maintenance
activity scheduling depending on the actual operating conditions encountered by the system.
2.2.2 Maintenance Activity Frequency
©2011 Stormwater360
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.