Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/0175 Request for Further Information - Settlers Cove MCU [As Published] · 132008.175

of 4

Text shows just the words. Original shows the document exactly as it was published.

                                            -3-


Services
19.   It is noted that the access driveway traverses across existing water and sewer mains.
      Please provide additional detail on the proposed vertical clearance distances between
      the proposed ramps and the various services. The vertical clearances shall be in
      accordance with Council’s Planning Scheme Policies PSP and PSP6.
Stormwater
20.   Provide a preliminary stormwater disposal design for the proposed development. The
      design shall be in accordance with the relevant approved Management Plans as
      described in Decision Notice 23118 DA. The design shall include pits, pipes, on site
      infiltration systems and collection and reuse tanks.
Sewer and Water
21.   Provide amended drawings that clearly show:
      21.1. accurate locations of all existing sewers, sewer manholes and rising mains.
      21.2. that all buildings, structures, overhangs etc are clear of easements over
            existing sewers. No structures will be permitted in sewerage easement,
22.   Provide a Long Section of proposed finished surface level along line of existing
      sewer. The Long section MUST include the accurate location of sewer.
23.   Provide Cross Sections of finished levels and finishes across easement, walkway at
      northern and eastern sides of site. The plans must include cross-section at driveway,
      walkway, and along eastern boundary across sewer rising main easements.
24.   All landscaping/plantings within easement and around sewer shall comply with Noosa
      Shire Council Guidelines for Planting and Landscaping (copy attached). Drawings
      shall be prominently endorsed with this requirement to affected areas.
      All future Landscaping Drawings submitted for approval shall clearly demonstrate
      compliance with this requirement.
Environmental Health
25.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
      No. 9       “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, must be submitted for the day-to-day operation of the development. It is
      critical that waste areas are properly planned. A copy of Planning Scheme Policy No.
      9 explaining exactly how to predict waste quantities and design waste areas is
      available from Council and the web. The Plan shall include the following information: -
      25.1. The types of waste that will be generated from the activities approved within
            the development.
      25.2. Estimated volumes or tonnage of both recyclables and waste generated.
      25.3. Methods to be used for dealing with garden waste.
      25.4. Initiatives to minimize waste either by waste prevention, reduction, re-use or
            recycling.
      25.5. Description of procedures for getting all waste to the bins; the storage of bins
            and the collection of bins by the contractor.
      25.6. A description of the design details of waste storage and recycling areas
            including size, location, elevation and floor plan, methods of bin washing and
            system to prevent storm water getting into sewer via the bin wash.

Used in these records

About this file

File size
16 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0175 Request for Further Information - Settlers Cove MCU [As Published].pdf · 16 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.