Delegated Report - Code - Planning OPW21 0107 · OPW21/0107

of 1

Text shows just the words. Original shows the document exactly as it was published.

Author	Development Engineer, Diogo Carrico
Development Assessment

APPLICATION DETAILS
Application No.	OPW21/0107
Applicant	Elisabeth Gail Clout Paul Joseph Clout
Proposal	Operational Works – Earthworks, Landscaping, Roadworks, Stormwater
Properly Made Date	15 April 2021
Information Request Date	14 May 2021
Information Response Date	15 June 2021
Decision Due Date	28 July 2021
Report Completed Date	27 July 2021
Report Reviewed By	Mark Lewis

PROPERTY DETAILS
Property Address	7 William St Noosaville Qld 4566
RP Description	Lot 24 RP 65319
Land Area	594 m²
Existing Use of Land	Vacant lot (after demolishing dwelling)

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	High Density Residential
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Acid Sulphate Soils; Flood
Assessment Type	Code
PROPOSAL
The application seeks approval for Operational Works – Earthworks, Landscaping, Roadworks, and Stormwater.
The proposal plan is included below.

Figure 1 – Engineering Works
site details
Background
The subject application follows up on the requirements of DA approval MCU20/0138.
Some of the IR items have not been satisfactorily responded to (SWMP Certification; Earthworks construction methodology; and driveway functionality) but relevant conditions have been included to address these items.
Site Description

Surrounding Land Uses

assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Works Codes.
cONSULTATION
Referral Agencies
Not Applicable
Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
Planner; and
Ecologist
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW21/0107 for Operational Works – Earthworks, Landscaping, Roadworks, Stormwater situated at 7 William St Noosaville Qld 4566 and described as Lot 24 RP 65319, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW21/0107
Street address:	7 William St Noosaville Qld 4566
Real property description:	Lot 24 RP 65319
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works – Earthworks, Landscaping, Roadworks, Stormwater
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
20-1343-F1	E	“Operational Works” Prepared by Lindsay Consulting (As annotated in red by Council)	09/06/2021
20-1343-F1A	E	“Earth Works Detail & Driveway Section” Prepared by Lindsay Consulting	09/06/2021
09.0	B	Landscape Plan	12/07/2021
CURRENCY PERIOD
The Currency Period for this development approval lapses if the development has not substantially started by 23 July 2023, unless an application to extend the currency period is approved by Council.
SITE SPECIFIC CONDITIONS
Prior to the prestart meeting, the following information/documentation must be submitted for council’s review and endorsement:
RPEQ certification that the design of the proposed stormwater management system for the subject lot, complies with QUDM’s requirements as well as Council’s Water Quality and Drainage Code;
A construction method plan for the proposed earthworks that does not contemplate the use of vibration equipment (either for the construction of the proposed retaining structures or soil compaction);
Updated plans showing a 1.8m wide footpath to the frontage of the subject property;
Demonstrate that a B99 vehicle will not bottom out or scrape entering/exiting the proposed driveway to the subject lot (considering a 1.8m wide footpath).
PRIOR TO COMMENCEMENT OF WORKS
Engineering
All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council.
A condition report including photographs of the frontage of the site must be completed and submitted to council prior to the prestart meeting.
Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties.
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction;
Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased;
Proposed fencing to the site during the construction phase of the development;
Adequate parking arrangements for construction workers;
No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off;
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures;
Works programme identifying key components of the works and their respective durations;
Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues;
Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details;
Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details;
identification of complaint management procedures including:
contact details for the on-site manager;
dispute resolution procedures;
For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage.  NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice;
The relevant conditions of the higher order Material Change of Use/Reconfiguration of Lot approval viz. MCU20/0138 to which this approval relates;
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines;
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Pavement Design and Construction
Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ.
Works within Road Reserve/Reinstatement
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council.
Pathways
All pathways must be constructed in accordance with the following requirements:
All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065;
Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards;
All paths must have a slip resistant surface;
Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists;
The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard.
Pathways must:
terminate in a manner that ensures smooth transition to existing surfaces for public safety;
be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility.
Site Access and Driveways
Driveway crossover must be constructed in accordance with council’s Standard Drawings RS-049, RS-050 and respective addendums.
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete;
The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties;
Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path;
The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works.
Earthworks and Retaining Walls
All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the On-Maintenance inspection.
Fall protection must be provided to retaining walls that are over 1m high.
Slope and batters are a maximum grade of:
1 in 6 where in proximity to waterbodies;
1 in 4 for grassed areas;
1 in 3 for planted areas;
1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets.
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows).
Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties.  The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have:
Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods;
Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods;
Been revised to address predicted rainfall events; and
Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be found inefficient.
The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note).
The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring.
The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways.
Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Landscaping, Fencing and Walls
The development site must be landscaped generally in accordance to the approved plan: Landscape Plan by Paul Clout Design, dated: 12/07/21.  The works must be undertaken in accordance with Council’s Planning Scheme Policy PSP2 - Landscaping for the Noosaville area, and must include in particular:
Screening vegetation with a mature height not less than 2.5 metres must be planted between the southern boundary and the Unit 2 Carport, running for the length of the carport wall;
A minimum of 2 climbing native plant species must be planted at the base of each architectural beam on the northern side of the driveway and trained to climb the structure with the result of softening the appearance of the structural elements in the landscape.
All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth.  All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached.
The area of land between the fence and the front property boundary must be densely landscaped with species able to screen any fencing from the street and achieve at least 50% cover at maturity. Landscaping most not encroach more than 500 millimetres into the road reserve or within 1.5 metres of a sealed footpath.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
On Maintenance
All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
certification that all works have been undertaken and completed in accordance with the requirements of this Permit;
maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection.
A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where:
a Council inspection reveals works do not comply with approval requirements
submitted certification falsely states works comply with approval requirements.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control
Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ).
As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the On-Maintenance inspection:
Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and
Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination.
If at the time of request for the On-Maintenance inspection, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability:
evidence that the site has been effectively stabilised in the short term;
evidence that soil has been adequately ameliorated;
evidence that seed of annual and perennial grass species has been applied at an adequate rate; and
that grass seed has germinated at a density that is likely to achieve an effective grass cover.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Building Works	All building work.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 11 of 12

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.png (image text)]
 

 

 

 

 

STORMWATER DRAINAGE NOTES
{URNS CONSTAUCTON SARRERS IGS SEAS SALE MANT AED TOENSIRE SAFE
"Shr GUS rN A cP ee SOL WT
= 05 PN) GAGE FOR PPES = SALT = 3750
‘No con WA CONE REY NOP SDL
{9S RELATWE CRY DENSITY (STD COMP)FOR MATERAL OIHER TH),
GENERAL NOTES (SOME MAY NOT APPLY)

   
 

 

 

Pa CENSTY FOR CCHESOMLESSMATERAL AS 2.1 A)

$AcLnuteus vane Si A sco Me ste EAD
‘nese o spnsen eNO BNC At revo
‘pecomor ant or rater Oa OMEN OAS
ugar tsps romeo ounces
MELA ION pests dna ee en cao
evan ona ost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(ano LEVEL. GROLESSHAL BESTRAGPED TO TEES PAR TOCEMSTRUTION Og putea RPACELEVE

  
 

 

 

 

LINDSAY CONSULTING '

ED

 

 
 
 
  

 

 

  
 
  
 
 
 
  
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
  
 
  
 

 

 

 

secenticaued

SEIN z gee CHENT ano PROUECT DESCRIPTION
‘umauconmen | QUT DESIGN
OPERATIONAL WORKS
N07 WILLIAM ST
o NODSAVLLE

 

DRAWING THLE
OPERATIONAL WORKS

 

SCALES

0
eee

(rg. £200

 

 

 

SURVEY DATUM

 

{ASSOCIATED CONSULTANTS

 

 

 

 

 

 

 

en

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘A SOL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0-B13-F1

 

 

 

 


[Attachment: image2.png (image text)]
Plan

Lot Plan

Dreec acy

2
Z4RR65319)

 


[Attachment: image3.png (image text)]
   
  

De ned

 

Ce

  

Ey,
2

   

      
 

         

2
. mS
A 2B. ATE LaLa
4 od o
a

 

 
 

7

 
 

Used in these records

About this file

File size
3.3 MB (large file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW21 0107.docx · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.