Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)
integrated water cycle management
drainage patterns, create batters or
plan; or (iv) aquatic habitat; and (c)
require retaining structures. The extent of
can be located: (i) outside natural
works is to be confirmed at detailed
waterways, wetlands and
design and is capable of being
biodiversity areas and any
conditioned.
associated buffer areas; and (ii)
PO14 AO14.1, AO14.2
Complies with PO
Constructed lakes (proposed as The constructed lake is designed in
No bulk earthworks are proposed. The
either public or private assets), accordance with best practice
site is developed, sealed and generally flat,
other than rural dams, are designed guidelines.
and finished surface levels across the site
to: Performance outcomes AO14.2 A detailed maintenance
are substantially unchanged. Localised
Acceptable Outcomes (a) meet the plan is prepared for the constructed
surface works are proposed to the
water quality objectives and avoid lake which identifies how typical
frontage in connection with the accessible
or minimise both within the lake lake management issues will be
parking space and shared area, which
and in downstream waterways in addressed, including maintenance
must be graded in accordance with AS/
accordance with the Environmental schedules, specifications and
NZS 2890.6, together with bollard footings
Protection (Water and Wetland detailed maintenance and
and a new garden bed. These are shallow,
Biodiversity) Policy 2019 and/or decommissioning costing is by the
confined to the frontage, and do not alter
local classifications; and costs. (b) proponent (through an established
drainage patterns, create batters or
minimise maintenance and sinking fund) to provide for
require retaining structures. The extent of
decommissioning costs and AO14.3 maintenance for the project life
works is to be confirmed at detailed
the requirement for specialised and, if required, objectives specified
design and is capable of being
maintenance equipment A and in Planning Scheme Policy 6, prior
conditioned.
techniques; and prepared for the to entering
project life and financial assurances
are provided (c) n