09        NOOSA PLAN 2020, SECTION 9.4.6



          Sustainable Building Design Code
Applies because: Works code named as a benchmark in Table 5.5.10.
The proposal is an internal fit-out of an existing building together with a new frontage treatment on a
developed, fully serviced and generally flat site. The outcomes of this code are addressed on that basis.

 Performance Outcome                   Acceptable Outcome                     Response

 PO1                                   No acceptable outcome provided
                                                                               Complies with PO
 Development minimises energy
                                                                               The proposal reuses an existing building
 consumption and the production
                                                                               rather than constructing a new one,
 No acceptable outcome provided of
                                                                               which is itself the most material energy
 greenhouse gas emissions. Water
                                                                               and materials saving available. The new
 efficiency and stormwater
                                                                               glazed curtain wall to the northern
 management Table 9.4.6.3 Criteria
                                                                               frontage provides natural light to the
 for assessment (part) Performance
                                                                               showroom floor, reducing artificial
 outcomes Acceptable outcomes
                                                                               lighting demand. Water efficiency, energy
 Water efficiency and stormwater
                                                                               efficiency and any provision for electric
 management
                                                                               vehicle charging are matters for detailed
                                                                               design and building assessment, and are
                                                                               capable of being conditioned.

 PO2                                   AO2.1, AO2.2
                                                                               Complies with PO
 Development maximises water           If for accommodation activities, a
                                                                               The proposal reuses an existing building
 efficiency on site by incorporating   minimum 3,000 litres of rain water
                                                                               rather than constructing a new one,
 rainwater collection and reuse        storage is provided per dwelling
                                                                               which is itself the most material energy
 measures for non­potable purposes     and reused for non­potable purposes
                                                                               and materials saving available. The new
 such as irrigation.                   and incorporated into a stormwater
                                                                               glazed curtain wall to the northern
                                       management plan for the
                                                                               frontage provides natural light to the
                                       development.
                                                                               showroom floor, reducing artificial
                                       AO2.2 With the exception of
                                                                               lighting demand. Water efficiency, energy
                                       accommodation activities, rain
                                                                               efficiency and any provision for electric
                                       water storage sufficient for the
                                                                               vehicle charging are matters for detailed
                                       intended use is captured and used
                                                                               design and building assessment, and are
                                       on­site for non­potable purposes and
                                                                               capable of being conditioned.
                                       incorporated into a stormwater
                                       management plan for the
                                       development. Editor’s note—The
                                       Queensland Development Code
                                       includes provisions for the
                                       installation of rain water tanks and
                                       the reuse of stormwater.

 PO3                                   AO3.1, AO3.2
                                                                               Complies with PO
 Development reduces stormwater        Development incorporates water
                                                                               The proposal reuses an existing building
 run­off by minimising impervious      sensitive urban design measures to
                                                                               rather than constructing a new one,
 areas and maximising site             manage stormwater.
                                                                               which is itself the most material energy
 vegetation to absorb water on site.   AO3.2 Development incorporates
                                                                               and materials saving available. The new
                                       porous pavements on low trafficked
                                                                               glazed curtain wall to the northern
                                       areas such as footpaths and car
                                                                               frontage provides natural light to the
                                       parks. Note: Porous pavements are
                                                                               showroom floor, reducing artificial
                                       not considered landscaping and do
                                                                               lighting demand. Water efficiency, energy
                                       not form part of the minimum
                                                                               efficiency and any provision for electric
                                       landscape requirements.
                                                                               vehicle charging are matters for detailed
                                                                               design and building assessment, and are
                                                                               capable of being conditioned.
Log in to download the original file

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.