Original source · versioned page text
Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)
regimes and maintaining fish steam ecology by maintaining pre
proposal does not materially alter the
passages. development low flow discharge
impervious area: the works are within the
regimes in accordance with the
existing building footprint, and at the
frequent flow management
frontage a new garden bed is introduced
objectives in PSP6 Engineering
while the existing frontage garden is
Design Standards Roads, drainage
removed, so the net change is minor. Any
and earthworks
regrading associated with the accessible
AO12.2 Instream structures such as
parking space is localised and will
roads, bridges, culverts, and other
maintain existing drainage patterns and
stormwater infrastructure do not
the existing point of discharge. No change
cause barriers to fish passage and
to the stormwater management system is
facilitate the movement of
proposed. Confirmation of finished
terrestrial and aquatic fauna along
surface treatment is a matter for detailed
waterway corridors.
design and is capable of being
AO12.3 Benthic substrate retains a
conditioned.
continuous
PO13 AO13.1, AO13.2
Complies with PO
Development is designed and The location and form of
The site is presently developed and
constructed to maintain surface and stormwater discharge points do not
sealed, and stormwater discharges to the
ground water balances that sustain alter the predevelopment hydrology
existing lawful point of discharge. The
the environmental values of water of receiving surface water or
proposal does not materially alter the
dependent ecosystems, including groundwater.
impervious area: the works are within the
downstream aquatic, riparian, AO13.2 Developments located on
existing building footprint, and at the
wetland and terrestrial ecosystems. groundwater recharge or discharge
frontage a new garden bed is introduced
Construction and establishment of areas are designed and managed in
while the existing frontage garden is
stormwater management systems accordance with a groundwater
removed, so the net change is minor. Any
assessment (part) Performance recharge and discharge
regrading associated with the accessible
Outcomes Construction and management plan prepared by a
parking space is localised and will
establishment of stormwater suitably experienced and qualified
maintain existing drainage patterns and
management systems groundwater hydrologist. The
the existing point of discharge. No change
groundwater recharge or discharge
to the stormwater management system is
must demonstrate that the
proposed. Confirmation of finished
development does not affect
surface treatment is a matter for detailed
groundwater balances beyond the
design and is capable of being
property boundaries. drainage and
conditioned.
earthworks provides guidance on
prepare a groundwater recharg
PO14 AO14.1
Complies with PO
Construction methods provide for An erosion and sediment control
The site is presently developed and
appropriate controls to avoid entry plan prepared in accordance with
sealed, and stormwater discharges to the
and transport of litter, sediment, the International Erosion Control
existing lawful point of discharge. The
and associated prescribed water Association Best Practice Books
proposal does not materially alter the
contaminantsinto receiving waters. demonstrates that the capture and
impervious area: the works are within the
Environmental Protection Act 1994. release of stormwater achieves the
existing building footprint, and at the
Performance Outcomes Acceptable design objectives listed in Table A:
frontage a new garden bed is introduced
Outcomes drainage and earthworks Construction phase – stormwater
while the existing frontage garden is
provides guidance on requirements management design objectives of
removed, so the net change is minor. Any
for preparing an Erosion the State Editor’s note— PSP6
regrading associated with the accessible
Management Plan. AO14.2 Engineering Design Standards
parking space is localised and will
Construction works are designed Roads, upstream runoff is diverted
maintain existing drainage patterns and
and managed to restrict the extent around the construction site;
the existing point of discharge. No change
of clearing and soil exposure to the sediment barriers are provided
to the stormwater management system is
minimum necessary for access, and downslope of disturbed areas to
proposed. Confirmation of finished
safe construction at any one time. prevent sediment washing into
surface treatment is a matter for detailed
AO14.3 For buildings: (a) (b) (c) (d) gutters, drains and waterways ,
design and is capable of being
AO14.4 Chemical flocculants used wetlands or drainage lines either on
conditioned.
as or off the
PO15 AO15
Complies with PO
Development does not discharge Wastewater (nonsewage) generated
The site is presently developed and
wastewater unless it can be from the development is collected
sealed, and stormwater discharges to the
demonstrated to not compromise and contained onsite, and is:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.