Original source · versioned page text
TPC 1947 - Amended Conditions Letter
Demagogue Pty. Ltd. - 188/88/Admin (TPC 1947) - 17/10/1988 - Page 2 14(g) 16. 21. (iii) the wall is to be landscaped in accordance with Condition 5 of this approval and provided with a drip irrigation system; (iv) the pathway shall not be provided at the top of the wall, but shall be relocated to the lower side of the retaining wall. . The approved retaining wall construction shall be completed prior to building works commencing on the site. The height and foundation details of the retaining wall shall be. fixed by ‘a Registered Geotechnical Engineer and will require approvel of the Shire _ Engineer prior: to construction works commencing. These works are. required in lieu of a contribution towards road improvements in accordance with Council's Noosa Hill Policy. The applicant shall construct a pedestrian walkway within the Edgar Bennett Avenue road reserve to link Picture Point to the existing walkway in Noosa Drive. The location of the proposed walkway shall * be Getermined following consideration of detailed engineering submissions and will have regard to the area of road proposed to be closed and the location of infrastructural services. ‘The walkway is to be designed so as to ensure minimal effect on the existing vegetation and shall provide sufficient erosion controls as required, by the Shire Engineer. Revegetation of the road reserve is required following completion. of construction works. ‘The walkway is to be designed so as to ensure minimal effect on the existing vegetation end ‘shall provide sufficient - erosion controls as required by the Shire Engineer. Revegetation of the road reserve is requited following completion of construction works. The walkway design shall provide for the location of stormwater and sewer pipes leading from the site and shall be designed to withstand possible dunal failure. Any spill on or damage to Noosa Drive road reserve resulting from construction works on the site shall be immediately removed and any reinstatement works provided, by the developer. If satisfactory restoration is not made within an acceptable period such work shall be carried out by Council at the Geveloper's expense. , Submission of a cash bond or treading bank guarantee to the sum of $100,000 to secure performance of conditions, prior to the issue of Building Approval. The level of security will be progressively released following completion of stages of the development to the satisfaction of the Shire ’ Engineer, Building Surveyor and Shire Planner. The stages shall accord with the following:-~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.