Town Planning Assessment Report

Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Mur




      Town Planning
      Assessment Report
      36 Tunba Court, Cooroy Mountain

      Development Permit for Operational Work - Filling and Excavation.



      December 2021
Log in to download the original file

Town Planning Assessment Report.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 12 pages

Page 2

Table of Contents
1.       SITE AND APPLICATION SUMMARY ................................................................................................................ 3

2.       PROPOSAL.............................................................................................................................................................................. 3

3.       BACKGROUND.................................................................................................................................................................. 6

4.       SITE DETAILS ........................................................................................................................................................................ 6

      4.1.        SITE DESCRIPTION ....................................................................................................................................................... 6

5.       ASSESSMENT REQUIREMENTS............................................................................................................................... 7

      5.1.        FRAMEWORK FOR ASSESSMENT .............................................................................................................................. 7

      5.2.        ASSESSMENT BENCHMARKS RELATED TO THE PLANNING REGULATION 2017 .................................. 8

6.       THE NOOSA PLAN .......................................................................................................................................................... 8

      6.1.        DEFINITIONS .................................................................................................................................................................. 8

      6.2.        LEVEL OF ASSESSMENT AND ASSESSMENT BENCHMARKS ........................................................................... 8

      6.1.        ASSESSMENT AGAINST KEY BENCHMARKS .......................................................................................................... 8

7.       CONCLUSION ................................................................................................................................................................. 13




Appendices
     Appendix A                   Proposal Plans
     Appendix B                   Global Stability Assessment Report
     Appendix C                   Earthworks Compaction Report
     Appendix D                   Erosion and Sediment Control Plan




                                                                                                                                                                             Page 2 of 13

Page 3

1.       Site and Application Summary
 Applicant
 Applicant:                                  Geoff Hussin C/- Brennan Planning Pty Ltd
 Contact Details:                            Marcus Brennan
                                             Mob: 0423 952 928
                                             Email: [email protected]
 Registered Landowner(s):                    Geoff Hussin



 Application
                                             Development Permit for Operational Works - Filling and
 Development Application:
                                             Excavation
 Level of Assessment:                        Code Assessable

 Referral Agencies:                          Nil
 SEQRP:                                      Regional Landscape and Rural Production Area


 Subject Site
 Address:                                    36 Tunba Court, Cooroy Mountain

 Lot Description:                            Lot 13 on SP133492

 Area:                                       9.426ha

 Easement(s):                                Yes - Electricity Infrastructure
 Covenants                                   Nil

 Local Plan Area:                            Nil

 Zone:                                       Rural Zone
 Applicable Overlays:                        + Landslide Hazard Overlay
                                                - Moderate hazard area



2. Proposal
The proposal involves retrospective approval and rectification works for filling and excavation that has
occurred at the premises for the purpose of a shed pad.

The pad has been position in the south east corner of the site and has a finished surface level of
approximately RL134.5 to 134.

The existing earthworks for the pad level provide a maximum cut of approximately 3.2m and a maximum fill
of approximately 2.3m relative to the natural ground surface as detailed in Figures 1 and 2 below.

                                                                                                     Page 3 of 13

Page 4

Figure 1 - Topographic plan of existing earthworks for shed pad




Figure 2 - Section plan of existing earthworks for shed pad


Some further rectification works will be carried to both the batters of the upslope and downslope to achieve
a Factor of Safety of 1.5.

To the cut batter, this will involve providing a 2m wide bench where the existing cut batter height exceeds
4m. The lower batter is to be no higher than 4m and the upper batter is to be no higher than 3.5m. Both
batters are to be no steeper than 380 in slope angle, and are to be separated by a bench with a minimum
width of 2m.

To the fill batter, this will involve flattening of the existing fill batter to 2.5H:1V
                                                                                                  Page 4 of 13

Page 5

Figures 1c and Figure 2a of the Global Stability Assessment report provided at Appendix B and as detailed
in Figures 3 and 4 below illustrate the extent of the proposed work.




Figure 3 - Benched Cut Batter




Figure 4 - Flattened Fill Batter


Please refer to Appendix A – Proposal Plans for further details.




                                                                                               Page 5 of 13

Page 6

3. Background
Noosa Council online application search system reveals the following application applying over the land:


  Application       Submitted
                                                        Details                        Stage/Decision
   Number             Date
                                  Repair & Rebuild - Storage Shed With Awning -
PC21/1488         19/08/2021                                                          Approved
                                  36 Tunba Ct COOROY MOUNTAIN
                                  Proposed Horse Facilities (Covered Arena,
                                  Stables, Wash Bay, Storage, Office, Verandah,
PC20/1037         25/10/2019                                                          Approved
                                  Tack and Feed Rooms) - 36 Tunba Ct
                                  COOROY MOUNTAIN
                                  36 Tunba Court Cooroy Mountain - Earthworks,
                                                                               Development
OPW19/0228        15/10/2019      Landscaping & Clearing Vegetation - Cavalier
                                                                               Permit
                                  Engineering Pty Ltd
112008.404        07/03/2008 20080404 Swimming Pool                                   Finalised
112007.449        12/03/2007      20070449 Addition                                   Finalised
112003.12241      31/10/2003      20032241 FARM SHED                                  Finalised


4. Site Details

4.1.     Site Description

The subject site is located at 36 Tunba Street, Cooroy Mountain described as Lot 36 on RP133492.

The site has a total area of 9.462ha, is irregular in shape, and has a frontage width of 66m to Tunba Court to
the north.

A dwelling house and associated structures is located in the southern portion of the site. Access to the
dwelling is achieve via a long driveway from Tunba Court.

The topography of the site varies, with it generally sloping downhill to the north away from a high point
adjacent to the western boundary at RL165. The low point of the site is positioned in the northern portion of
the site at RL107.

A waterway commences on the site adjacent to its western boundary and runs downhill in a north westerly
direction.




                                                                                                   Page 6 of 13

Page 7

Figure 3 – Aerial photograph (2019)


5. Assessment Requirements

5.1. Framework for Assessment

Categorising Instruments for Statutory Assessment

In accordance with Section 43 of the Planning Act 2016, the following categorising instruments may contain
assessment benchmarks applicable to development applications:
•      the Planning Regulation 2017
•      the Planning Scheme for the local government area
•      any temporary local planning instrument
•      any variation approval

Of these, the planning instruments relevant to this application are discussed below:




                                                                                              Page 7 of 13

Page 8

5.2.    Assessment Benchmarks Related to the Planning Regulation 2017

Part E of the State Planning Policy

The current State Planning Policy (SPP) commenced on 3 July 2017. The applicable State interests relating
to development assessment are set out in Part E of the document and are under five broad themes. The
assessment benchmarks of the SPP Part E that are relevant to the development proposal are consistent
with the current provisions of the Planning Scheme and would not warrant further assessment.

Schedule 10 of the Regulation

The proposal does not trigger referral to any agencies or assessment against any of the benchmarks
contained with Schedule 10 of the regulation.


6. The Noosa Plan

 6.1. Definitions

The Noosa Plan 2020 defines operational work to have the meaning as the Planning Act 2016, being:

“operational work means work, other than building work or plumbing or drainage work, in, on, over or under
premises that materially affects premises or the use of premises.”

Consequently, the subject earthworks relating to excavation and filling would constitute operational work in
accordance with the definition under the planning scheme and Planning Act 2016 .


 6.2. Level of Assessment and Assessment Benchmarks

Table 5.8.3 - Operational Work - Excavation and Filling

Pursuant to Table 5.8.3 of the Noosa Plan 2020, the proposed buildings works are accepted development
subject to requirements where:

Excavation or filling of land not associated with material change of use if involving 100m³ or less of material.

However, the subject earthworks involve in excess of 100m3 of excavation and filling and are consequently
code assessable against the following codes:

    +    Earthworks Code
    +    Water Quality and Drainage Code


 6.1. Assessment against key benchmarks

An assessment against the key outcomes contained within the applicable codes is provided in Table 6.1.1
below:




                                                                                                     Page 8 of 13

Page 9

Table 6.1.1 - Assessment against key benchmarks

 Earthworks Code
 Performance Outcomes                     Acceptable Outcomes                       Compliance
 Drainage                                 AO1                                       AO1 - Complies
 PO1                                      Filled or excavated areas have a          The proposed earthworks are in a
 Finished surface levels ensure land      minimum gradient of 0.5% and drain        rural environment. They will be free
 is free draining.                        to Council’s stormwater infrastructure    draining and achieve a minimum
                                          where available, or where stormwater      gradient of 0.5%.
                                          infrastructure is not available, toward
                                          the street.

 Hydraulics                               No acceptable outcome provided            PO2 - Complies
 PO2                                                                                The proposed earthworks will not
 Change to the levels on site do not                                                cause adverse impacts to the
 have an adverse impact on the                                                      flooding and drainage
 flooding and drainage                                                              characteristics off-site.
 characteristics off-site.

 Geotechnical considerations              AO3.1                                     AO3.1 - Complies
 PO3                                      Filling works are undertaken in           Filling works have been
 Earthworks do not result in              accordance with Council’s Planning        undertaken in accordance with
 geotechnical instability on-site or to   Scheme Policy PSP6 Engineering            PSP6 including that:
 nearby premises.                         design standards - roads, drainage        + they have been supervised by a
                                          and earthworks.                              geotechnical engineer to ensure
                                                                                       an appropriate compaction rate;
                                          AO3.2                                     + an erosion and sediment control
                                          Where the filling is for residential,        management plan has been
                                          commercial or industrial purposes the        established to ensure that no
                                          works comply with Australian                 sedimentation occurs
                                          Standard - Guidelines for earthworks         downstream; and
                                          on commercial & residential               + the works have been monitored
                                          development.                                 by Aussie Environmental.

 Local amenity
 PO4                                      AO4.1                                     AO4.1 - Complies
 Undertaking earthworks does not          The following control measures are        Appropriate control measures
 adversely impact on the amenity of       implemented—                              have been implemented by Aussie
 the local area by way of dust, noise      a) regular water spraying of             Environmental to ensure that the
 or visual amenity.                           exposed areas to suppress dust;       works will not result in dust or other
                                           b) provision of dust stabilised or       nuisance issues.
                                              sealed internal roads;
                                           c) protective covering of exposed
                                              areas that are left for more than 2
                                              weeks; and
                                           d) unless a development permit
                                              provides otherwise, disturbed
                                              areas are revegetated using
                                              species identified in Council's
                                              Planning Scheme Policy PSP2
                                              Landscaping.

                                          AO4.2                                     AO4.2 - Complies
                                          Earthworks are undertaken only            Earthworks will not be undertaken
                                          during the hours of 7:00am to             outside of the specified hours
                                          6:00pm, Monday to Friday and
                                          7:00am to 3:00pm on Saturday. No
                                          work is undertaken on Sunday or
                                          public holidays.

                                                                                                              Page 9 of 13

Page 10

Vegetative waste                          AO5.1                                         AO5.1 - 5.4 - Not Applicable
PO5                                       Cleared vegetation is transported off-        The earthworks did not require
Vegetation cleared from a                 site for disposal in an approved green        clearing of vegetation.
development site is disposed of in        waste disposal facility.
an environmentally responsible
manner.                                   AO5.2
                                          Cleared vegetation is mulched on-
                                          site and reused for landscaping of the
                                          finished development.

                                          AO5.3
                                          Cleared vegetation is disposed of for
                                          the purpose of firewood.

                                          AO5.4
                                          Disposal of vegetative waste by
                                          burning off is avoided.

Managing contamination risk               AO6.1                                         AO6.1 - Complies
PO6                                       Fill material is solid clean earth, free of   All material was contained within
Materials used as fill are suitable for   putrescible or refuse                         the development footprint.
development and future use of the         material, vegetation, acid sulfate
land and filling or excavation works      soils, building or construction material
do not result in the contamination of     or other material or contaminants.
land.
                                          AO6.2                                         AO6.2 - Complies
                                          The site is not on the contaminated           The site is not on the contaminated
                                          land register.                                land register.

Haulage activity and amenity              No acceptable outcome provided                PO7 - Not Applicable
PO7                                                                                     No material will be transported to
Haulage of material to and from                                                         and from the site.
a site ensures—

a) minimal disturbance to
   neighbouring properties and
   properties along the haulage
   route; and
b) Council’s road infrastructure
   including pavements is not
   adversely affected.

Extent of earthworks                      AO8                                           AO8 - Complies
PO8                                       All earthworks, including cut and fill        All material will be contained within
The layout of the development             batters, retaining walls and the like are     the development footprint.
provides adequate, clearly defined        contained within the subject site.
and easily accessible—

a) on-site vehicle parking and
   manoeuvring areas; and
b) loading and manoeuvring areas
   for delivery and service
   vehicles.



Sloping sites                             AO9                                           PO9 - Performance Outcome
PO9                                       Cut or fill is less than 1.5 metres in        The cut and fill depths exceeds
On sloping sites development              depth relative to the natural ground          1.5m in height as detailed on the
follows the natural landform              level.                                        proposal plans. The cut and fill

                                                                                                                 Page 10 of 13

Page 11

wherever practical and excavation                                               follows the natural land form and
or filling is minimal.                                                          will be carried out in accordance
                                                                                with the recommendation of the
                                                                                submitted Global Stability
                                                                                Assessment Report at Appendix B.

Infrastructure protection                No acceptable outcome provided         PO10 - Complies
PO10                                                                            The earthworks will not impact on
Earthworks and                                                                  infrastructure.
vehicular access do not adversely
impact on the capacity, operations
and maintenance of existing
infrastructure.

Environmental protection                 No acceptable outcome provided         PO11 - Complies
PO11                                                                            The earthworks will not impact on
Earthworks minimise any adverse                                                 groundwater, watercourses and
impact upon groundwater,                                                        native vegetation as demonstrated
watercourses, drainage lines,                                                   in the submitted Global Stability
wetlands, and native vegetation.                                                Assessment Report at Appendix B
                                                                                and Erosion and Sediment Control
                                                                                Plan at Appendix D.

Water Quality and Drainage Code
Performance Outcomes                     Acceptable Outcomes                    Compliance
Stormwater drainage design               AO1                                    PO1 - Performance Outcome
PO1                                      A stormwater management plan is        The earthworks have been
The development and its                  prepared consistent with PSP6          managed in accordance with an
stormwater management system is          Engineering Design Standards -         Erosion and Sediment Control Plan
planned and designed having              Roads, drainage and earthworks.        so as to not cause erosion or
regard to:                                                                      sedimentation downstream and
  a) the natural features of the site;                                          protect environmental values.
  b) the need to avoid impacts
      and potential risks
      to ecologically important
      areas;
  c) the likely effectiveness of
      erosion and sediment control
      and stormwater drainage
      measures during rainfall
      events during and post
      construction; and
  d) the need to protect
      environmental values and
      water quality of receiving
      waters both during and post
      construction.

Construction and establishment           AO14.1                                 AO14.1 - Complies
of stormwater management                 An erosion and sediment control plan   The earthworks have been carried
systems                                  prepared in accordance with the        out and monitored in accordance
PO14                                     International Erosion Control          with an Erosion and Sediment
Construction methods provide for         Association Best Practice Books        Control Plan at Appendix D
appropriate controls to avoid entry      demonstrates that the capture and      prepared by Aussie Environmental
and transport of litter, sediment, and   release of stormwater achieves the     at Appendix D.
associated prescribed water              design objectives listed in Table A:
contaminants into receiving waters.      Construction phase – stormwater
                                         management design objectives of the
                                         State Planning Policy (Appendix 2).


                                                                                                       Page 11 of 13

Page 12

Editor’s note— PSP6 Engineering
Design Standards - Roads, drainage
and earthworks provides guidance
on requirements for preparing an
Erosion Management Plan.

AO14.2
Construction works are designed and      AO14.2 - Complies
managed to restrict the extent           No vegetation clearing was
of clearing and soil exposure to the     necessary and soil exposure has
minimum necessary for access, and        been limited to a shed pad, batters,
safe construction at any one time.       and access.

AO14.3
For buildings:                           AO14.3 - Not Applicable
  a) upstream runoff is diverted         The proposal does not involve
      around the construction site;      buildings.
  b) sediment barriers are provided
      downslope of disturbed areas
      to prevent sediment washing
      into gutters, drains
      and waterways , wetlands or dr
      ainage lines either on or off
      the site; and
  c) temporary or permanent
      downpipes are connected to
      the stormwater system before
      laying the roof; or
  d) localised erosion is avoided by
      directing flow from downpipes
      over non-erosive areas.

AO14.4
Chemical flocculants used as part of     AO14.4 - Complies
an erosion and sediment control plan     Erosion and sediment control
do not harm the environmental values     measures will be undertaken in
within receiving waters.                 accordance with best practice
                                         standards so as to not cause
AO14.5                                   environmental harm.
Appropriately sized litter containment
areas, with provision for sorting        AO14.5 - Not Applicable
recyclables are provided for the type
of litter expected to be generated
onsite.




                                                                 Page 12 of 13

Page 13

7. Conclusion
This report has identified that the proposed development complies with the relevant benchmarks contained
within the Noosa Plan 2020 and does not raise any significant issues that cannot be addressed by reasonable
and relevant conditions.

This office trusts that the information supplied comprehensively addresses all of the issues that are to be
considered by The Noosa Plan 2020. Should you have any questions in relation to the proposal, or any
aspect of the development, please do not hesitate to contact the undersigned on 0423 952 928 or via email
[email protected]



Yours sincerely,



Marcus Brennan
B. Urb. Reg. Plan.




                                                                                               Page 13 of 13

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.