                                             Officer:            Tracy Arthur
                                             Direct Telephone:   (07) 5449 5228
                                             Response Address:   PO Box 141, Tewantin QLD 4565
                                             Email:              [email protected]
                                             Our Reference:      2007/836
                                             Your Reference:
22 May 2008

Javaka Pty Ltd
PO Box 1551
NOOSA HEADS QLD 4567




Dear Sir/Madam
                                 Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 21 May 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1       APPLICATION DETAILS

    Application No:               2007/836
    Street address:               55 Elizabeth Street, Noosaville
    Real property description:    Lot 1 RP 73068
    Planning Scheme:              The Noosa Plan

2       DECISION DETAILS
Council on 6 August 2007 decided to issue the following type of approval:-
       Development Permit for Operational Works - Landscaping, Car Parking & Access,
        Frontage Works, Stormwater Disposal, Sediment & Erosion Control & Filling
In relation to the request to make a change to the existing approval, Council on 21 May
2008 decided to:
A.      Approve a change to the development approval with changes to Conditions 14 & 15
B.      Issue a Change to an Existing Approval
3       RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Permit is 2 years from the date that this
development approval takes effect.
Full text of the other 9 pages

Page 2

                                               -2-                                 2007/836




4     ASSESSMENT MANAGER CONDITIONS
Landscaping
1.    The site is to be landscaped in accordance with Council’s Policy on Landscaping
      Guidelines and the approved plan of Development. The approved plans and
      documentation titled Landscape Plan Drawing No. 070316-2 Issue B prepared by
      Greenscapes Nursery & Design dated 14/6/2007 and may be amended by these
      conditions.
2.    All manholes, inspection pits and grates are to be raised to finish surface level and
      kept free of cover and be visible at all times to ensure prompt access in case of
      emergency.
3.    The landscape construction is to be implemented in accordance with the amended
      landscape plan, planting schedule and horticultural industry best practices.
4.    Provide replacement species for the following plants:

         Location &      Plant     species   to   be          Replacement Plant
         Replaced

         CYCAS revoluta, replace all apart from DORYANTHES excelsa
         around the pool area

         ORPHIOPOGON             japonica    (mondo DIANELLA caerulea
         grass)
                                                       DIANELLA brevipendunculatum


         WOODYETIA bifurcata, frontage areas           ARCHONTOPHOENIX cunninghamiana

             Refer to the amended landscape plan for details and location.
5.    All trees must be located a minimum of 1.0 metres from all services to prevent
      root/service conflict and to provide future ease of maintenance requirements.
6.    All native plant species located in group plantings shall not be subjected to any
      hedging maintenance regimes.
7.    All street trees (HARPULLIA pendula 100 litre) shall be established between the 1.5
      m wide new concrete footpath and the back of kerb. Refer to the amended landscape
      plan for details and location. The trees shall be located 1m from the rear of the kerb.
8.    All street trees and internal trees 45 litre and greater must be securely staked and tied
      to assist their growth during the establishment period.
9.    The density of planting must achieve the set out requirements as detailed on the
      approved landscape plan. Refer to the amended landscape plan for details and
      locations.
10.   The applicant must ensure that all landscaping treatment does not unduly
      restrict/prevent access to service meters within the site.
11.   All palms shall be grouped in clumps to reflect their natural environment.

Page 3

                                             -3-                                 2007/836



12.   Prior to commencement of any clearing or demolition works on site, all trees detailed
      for retention detailed on approved plan shall be provided with protective barricade
      fencing to prevent damage or subsequent loss. The tree protection methods shall
      remain in place until all building construction works on site have been completed.
13.   This Development Permit lapses if the development has not happened by 6 August
      2009, unless application to extend the currency is approved by Council.
Land Development (frontage works, access, car parking, stormwater disposal, sediment
and erosion controls)
14.   The development shall be carried out in accordance with Engineering drawings Nos.
           27973-TC1B         dated 17/07/07                by Rienmac Pty Ltd
           27973-C1C          dated 18/06/07                by Rienmac Pty Ltd
           1740-1B            dated 3/4/08                  by Construction Hydraulic
           1740-0-2           dated 11/05/07                by Construction Hydraulic
           or as modified herein
15.   Roof and surface runoff connection to Council’s drainage system shall be generally
      as shown on drawing No. 1740-1B dated 3/4/08 by Construction Hydraulic. The
      manhole at the proposed junction with Council’s existing drainage system in Elizabeth
      Street shall be with constructed a trafficable lid. The construction of the manhole and
      reinstatement works to the road formation shall be undertaken in accordance with
      Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
      Drainage and Earthworks and the current standard drawings. In this regard a revised
      drainage plan indicating the abovementioned changes shall be submitted to Council
      for approval prior to the pre-start meeting.
16.   The two existing trees (Mango and Tuckeroo) located in the north-eastern corner of
      the site shall be retained and any works carried out on site shall not have an adverse
      impact upon these trees. The proposed stormwater drainage system and associated
      retaining structures shown on drawing No. 1740-0-1A dated 15/06/07 by Construction
      Hydraulic shall be relocated to ensure the preservation of these trees. In this regard
      a revised drainage plan indicating the abovementioned changes shall be submitted to
      Council for approval prior to works commencing.
17.   The edge of the access driveway shall be setback a minimum of 500mm from the
      adjacent property boundary.
18.   The proposed visitor carspace in the front setback from Elizabeth Street shall be
      constructed with a sealed surface with minimum dimensions of 2.5m wide and 5.4m
      deep clear of any obstructions. Stormwater runoff from the visitor carspace shall be
      directed to the stormwater drainage system.
19.   A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of
      the development. The footpath shall have a slip resistant surface. The alignment, of
      which, shall be determined on site with Council’s Construction Technical Officer. The
      expansion joints in any bikeway/footpath shall be “sawcut” not trowel jointed.
20.   Install suitable root barrier where proposed trees are adjacent to paths, pavement etc
      in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants
      and Guidelines.

Page 4

                                            -4-                                 2007/836



21.   Suitable sediment control devices ("in pit” pollution control devices) shall be
      temporarily installed into the first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after
      each rain event.

      These devices are to remain in place during the civil works and construction phases
      of the development.

      The location and type of device to be installed shall be established at the “pre start”
      meeting with Council’s Construction Technical Officer and shall be installed prior to
      the commencement of any works.
22.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7)
      days’ notice of intention to commence works to arrange a “pre start” meeting
      regarding the civil works.
23.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to
      ensure that any sub contractors also have the appropriate insurance and public
      liability documentation.
24.   Prior to the “pre start” meeting, the principal contractor must be provided with
      a copy of Council’s signed approved drawings and conditions by the applicant.
25.   The Consulting Engineers for the project shall be currently Registered Professional
      Engineers of Queensland (RPEQ). The consulting engineers are responsible for
      arranging all inspections, with Council’s Construction Technical Officer or nominated
      staff.
26.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ)
      supervising the project. (This person will be the contact for the project).
27.   Council standards shall apply to these works unless otherwise modified herein.
28.   The person acting on this permit shall ensure that its consultants and contractors take
      all reasonable care during the construction of the engineering works to ensure that
      Council property, road pavements or facilities (such as underground drainage, water
      supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected
      against any damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors
      shall forthwith notify the Manager Land Development and shall forthwith rectify the
      damage to that property or facility at its cost and to the satisfaction of the Manager
      Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work
      at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to
      the commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at
      the cost of the Applicant, such cost being paid prior to the commencement of the use.

Page 5

                                            -5-                                2007/836



29.   The development of the site shall be carried out in such a manner as to prevent dust
      and/or sand nuisance to residents and/or tenants in the vicinity of the development.
30.   Construction work and other associated activities are permitted only during the hours
      of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or
      public holidays, except where extended hours are approved by the Manager-Land
      Development or his nominee.
31.   All signage, including that for safety during construction shall be in accordance with
      the Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
32.   Safe pedestrian access on Elizabeth Street shall be maintained at all times. Should
      footpath / road closures be necessary to carry out construction works, Council’s
      Construction Technical Officer (ph 0410 512 505) must be notified prior to the
      proposed closure.
33.   Sediment and erosion control measures must be in place prior to works commencing.
      If such measures are not in place or are not satisfactory, “on the spot “fines may be
      issued. Such fines can be issued if sediments from the site are found to enter or have
      the potential to enter Council’s stormwater system or natural waterways. Although the
      sediment and erosion control measures have been approved on drawing No 1740-0-2
      dated 11/05/07 by Construction Hydraulic, Council’s Manager – Land Development
      may request further controls to be installed should approved measures be inefficient.
34.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross
      pollutant traps in accordance with the manufacturers specifications.
35.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross
      pollutant traps on a weekly basis and after each storm event.
      The owners of the subject property shall enter into an ongoing maintenance contract
      with a Registered Contractor to clean and maintain the grease/oil arrestor pits/gross
      pollutant traps on a regular three monthly cycle and on a “On Call” basis in the case
      of an emergency.
      The management and maintenance of the grease/oil arrestor pits/gross pollutant
      traps shall be included in the Community Management Scheme for the completed
      development.
36.   All stormwater drainage lines including private drainage lines (also known as inter-
      allotment drainage lines) or as otherwise approved by Council’s Manager of Land
      Development shall be inspected by closed circuit television (CCTV) at the completion
      of all works and immediately prior to acceptance ‘On Maintenance’. Council’s
      Construction Technical Officer shall be advised of the timing of this inspection.
      A report of the CCTV inspection, including photographic records (which includes
      photos & video recordings burnt onto a CD) of the inspection shall be submitted to the
      Council for approval. Any defects or substandard works shall be recorded and
      accurately illustrated on the drainage plan showing the location of the defect(s).
      Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
      applicants expense with a further CCTV inspection arranged once the rectification
      works have been completed.
      To this extent all CCTV inspections, including any additional inspections necessary
      following defect identification and rectification, shall be entirely at the applicant’s
      expense. Any costs incurred by Council in reviewing the CCTV inspection results
      shall also be borne by the applicant.

Page 6

                                             -6-                                 2007/836



37.    Certification of the completed works must be provided by the supervising engineer,
       together with certification from the Hydraulic Engineer that the completed works
       conform with all aspects of the drainage design for the development.
38.    Prior to acceptance of civil works to become Council assets "On Maintenance", the
       lodgement of satisfactory “As Constructed” records shall be submitted to Council.
       As Constructed drawings and data shall be certified by a qualified experienced Civil
       Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre
       and the location, level and type of all services and structures. All of which shall be
       submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to
       drainage structures, finished ground levels and pavement surface levels. The data
       shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
       (Guidelines on the use of ADAC are available at www.adac.com.au) and Council’s
       Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
       Earthworks.
       Approval of works shall not be granted until all As Constructed information has been
       supplied and accepted by Council.
39.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the
       greater) will be imposed on construction works during the maintenance period, which
       is a minimum period of 12 months duration. Such bond must be lodged by, and shall
       only be accepted from the Developer for the works.
40.    The works to become Council assets will not be accepted "On Maintenance" until the
       landscaping is completed.
41.    These works are also to be in compliance with the relevant conditions of
       Development Permit No. 23737 DA.
42.    Notwithstanding that Council has checked the plans with due care, where it is found
       during construction that variations from Council's standards exist, then Council
       standards shall apply.
5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger          Referral          Referral Agency      Referral Address
                           Status

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
development assessment conditions.
7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions
of approval:

Page 7

                                              -7-                                  2007/836



1.     Should any changes or modifications to the approved plans be required as a result of
       construction constraints, a Change to an Existing Approval Application under the
       Integrated Planning Act must be made. Amended plans clearly indicating the changes
       must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
any obligations under the ACH Act.
8      PROPERTY NOTES
Not applicable
9      PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit                Subject of the required Development Permit
 required
 Nil

11     SELF ASSESSABLE CODES
Nil
12     SUBMISSIONS
Not applicable
13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions
from the Integrated Planning Act 1997 is attached.

Page 8

                                            -8-                                2007/836



During the appeal period, you as the applicant may make written representations to Council
about the conditions contained within the development approval. If Council agrees or part
agrees with the representations, a “negotiated decision notice” will be issued. Only one
“negotiated decision notice” may be given. Taking this step will defer your appeal period,
which will continue after Council makes its decision. (Refer to sections 3.5.17 and 3.5.18 of
the Integrated Planning Act 1997).
15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies of
Council’s decision are available on line at www.sunshinecoast.qld.gov.au, or at Council
Offices.

DECISION NOTICE HISTORY
 Original Decision Notice issued 6 August
  2007.
 Changes to an Existing Approval issued 21
  May 2008 with amendment to Conditions 14 &
  15.
Yours faithfully,



Tracy Arthur
SENIOR PLANNING OFFICER

Page 9

                                                             -9-            [document year]/[document number]




                                                 Appeal Rights
                                                 INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                          (5) If an application is processed under section
Planning Act (Chapter 4).                                          6.1.28(2), appeal rights for submitters for the
                                                                   application are available only for the aspects of the
Division 8 - Appeals to court relating to
                                                                   development that would have required public
development applications
                                                                   notification under the repealed Act.
Appeals by applicants
                                                                         (6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application              concurrence agency code, appeal rights for
may appeal to the court against any of the following-              submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development          the part of the approval that represents the
    application;                                                   concurrence agency’s response for the code.
(b) a matter stated in a development approval,                     Appeals by advice agency submitters
    including any condition applying to the                        4.1.29.(1) An advice agency may, within the limits of
    development, and the identification of a code                  its jurisdiction, appeal to the court about the giving of
                          1
    under section 3.1.6;                                           a development approval for a development
(c) the decision to give a preliminary approval when a             application if-
    development permit was applied for;                            (a) the development application involves impact
(d) the length of a currency period;                                     assessment; and
(e) a deemed refusal.                                              (b) the advice agency told the applicant and the
    (2) An appeal under subsection (1)(a) to (d) must                    assessment manager to treat its response to the
be started within 20 business days (the “applicant’s                     application as a submission for an appeal.
appeal period”) after the day the decision notice or                     (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant.              days after the day the decision notice or negotiated
    (3) An appeal under subsection (1)(e) may be                   decision notice is given to the advice agency as a
started at any time after the last day a decision on the           submitter.
matter should have been made.                                      Appeals for matters arising after approval given
Appeals by submitters                                              (co-respondents)
4.1.28.(1) A submitter for a development application               4.1.30.(1) For a development approval given for a
may appeal to the court about-                                     development application, a person to whom any of the
                                                                   following notices have been given may appeal to the
(a) the giving of a development approval, including                court against the decision in the notice-
    any conditions (or lack of conditions) or other
    provisions of the approval; or                                 (a) a notice giving a decision on a request for
                                                                         extension of the currency period for an approval;
(b) the length of a currency period for the approval.
                                                                   (b) a notice giving a decision on a request to make a
    (2) The appeal must be started within 20 business                    minor change to an approval.
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is                     (2) The appeal must be started within 20 business
given to the submitter.                                            days after the day the notice of the decision is given
                                                                   to the person.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the                    (3) Subsection (1)(a) does not apply if the
decision.                                                          approval resulted from a development application
                                                                   (superseded planning scheme) that was assessed as
    (4) If an application involves both impact                     if it were an application under a superseded planning
assessment and code assessment, appeal rights for                  scheme.
submitters are available only for the part of the
application involving impact assessment.                                 (4) Also, a person who has made a request
                                                                   mentioned in subsection (1) may appeal to the court
                                                                   against a deemed refusal of the request.
                                                                         (5) An appeal under subsection (4) may be started
                                                                   at any time after the last day the decision on the
                                                                   matter should have been made.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)

Page 10

                                                       - 10 -                                       2007/836

Division 9 - Appeals to court about other matters               (b) a matter stated in a development approval,
Appeals for matters arising after approval given                    including any condition applying to the
(no co-respondents)                                                 development, and the identification of a code
                                                                                         3
                                                                    under section 3.1.6;
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court                 (c) the decision to give a preliminary approval when a
against the decision in the notice-                                 development permit was applied for;
(a) a notice giving a decision on a request to change           (d) the length of a period mentioned in section 3.5.21
    or cancel a condition of a development approval.                currency period;
                                   2
(b) a notice under section 6.1.44 giving a decision to          (e) a deemed refusal.
    change or cancel a condition of a development                   (2) An appeal under subsection (1)(a) to (d) must
    approval.                                                   be started within 20 business days (the “applicant’s
    (2) The appeal must be started within 20 business           appeal period”) after the day the decision notice or
        days after the day the notice of the decision is        negotiated decision notice is given to the applicant.
        given to the person.                                        (3) An appeal under subsection (1)(e) may be
    (3) Also, a person who has made a request                   started at any time after the last day a decision on the
        mentioned in subsection (1)(a) may appeal to            matter should have been made.
        the court against a deemed refusal of the               The Registrar for the Building and Development
        request.                                                Tribunal may be contacted at the website
    (4) An appeal under subsection (3) may be started           http://www.localgovernment.qld.gov.au/
        at any time after the last day the decision on
        the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;

2
     Section 6.1.44 (Conditions may be changed or
                                                                3
    cancelled by assessment manager or concurrence                  Section 3.1.6 (Preliminary approval may override local
    agency in certain circumstances)                                planning instrument)

Used in these records

About this file

File size
63 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2007.00000836.002 [As Published].pdf · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.