2301-33112 SRA - Response with conditions
Attached to the e-mail MCU23/0007 - Application correspondence - 45 and 47A Maple Street, Cooroy and 9 Myall Street, Cooroy.
2301-33112 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Development permit for material change of use for Multiple Dwelling (11 units)
Schedule 10, part 9, division 4, subdivision 2, table 4, item 1 (Planning Regulation 2017) – Material
change of use of premises near a State transport corridor —The chief executive administering the
Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to
be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
1. Stormwater management (a) At all times.
(a) Stormwater management of the development must ensure no
worsening or actionable nuisance to the state-controlled road. (b) Prior to obtaining
development approval
(b) Any works on the land must not: for operational work or
(i) create any new discharge points for stormwater runoff onto building work,
the state-controlled road; whichever occurs first
(ii) interfere with and/or cause damage to the existing stormwater
drainage on the state-controlled road; (c) Within 20 business
(iii) surcharge any existing culvert or drain on the state-controlled days of the completion
road; of works.
(iv) reduce the quality of stormwater discharge onto the state-
controlled road.
(c) RPEQ certification with supporting documentation must be
provided to North Coast District Development Assessment
Team, via [email protected] (07) 5451 7055,
within the Department of Transport and Main Roads, confirming
that the development has been designed and constructed in
accordance with parts (a) and (b) of this condition.
2. Managing Noise Impacts (a) and (b) Prior to the
(a) Noise attenuation measures to achieve the following must be commencement of use
provided: and to be maintained at
All upper level balconies facing Myall Street must include all times.
balustrades that are solid, gap-free and continuous for their
complete length other than gaps required for drainage
purposes in accordance with the Building Code of Australia.
(b) Ground level unit fencing facing Myall Street is to be a solid gap-
free fence, or other solid gap free structure.
State Assessment and Referral Agency Page 3 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2301-33112 SRA - Response with conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.