Council archive · source document
Appendix A - Code Assessment Tables · MCU12/0133
From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-09-04 09:38.
SPECIFIC OUTCOMES PROBABLE SOLUTIONS RESPONSE / COMPLIANCE
Soil stability
O27 Landscaping works are design and sited to ensure the No solution provided Complies. The site is not in a landslide hazard area and does
stability of soils and minimise sediment and erosion activity, not contain steep slopes. Landscaping area will be maximised.
particularly on steep slopes and in landslide hazard areas,
making use of soft landscaping rather than hard landscaping
solutions wherever possible.
Carparking areas
Off street carparks
O28 Landscaping of carparking areas is designed to— S28.1 One advanced canopy tree (a minimum of 100 litres pot Complies with Specific Outcome. Landscaping is provided
a) reduced the visual impact of the development; size) is provided— around the proposed carparking area as shown in the Concept
b) provide for advanced canopy trees to shade vehicles and to a) in towns and villages, shopping centres or commercial Landscape Plan at Appendix B. However, the following
reduce reflected radiation; areas— for every 4 carparking spaces; or features of the proposal must be noted:
c) ensure canopy trees are protected from vehicle damage by b) otherwise—for every 6 carparking spaces; Pervious pavement surface will be used for the carpark
providing adequate sized garden beds; AND Excess surface runoff will drain to landscaped areas for
d) maximise opportunities for infiltration of rainwater on-site; and infiltration
e) minimise contaminated runoff entering the stormwater system S28.2 A minimum area of 5m2 is provided around each canopy Perimeters will be landscaped (or have vegetation retained)),
and waterways. tree, which is mulched and treated; largely screening the development.
AND
S28.3 Plants are grouped in mulched beds rather than using
individual, evenly spaced trees and scrubs;
AND
S28.4 Semi-pervious pavement surfaces are used, such as
grass cell paving, to increase infiltration of rainwater and
minimise contaminated runoff, including hydrocarbons, entering
the stormwater system and waterways;
AND
S28.5 Runoff from carparking areas is directed to landscaped
areas to minimise contaminate runoff, including hydrocarbons,
entering the stormwater system and waterways;
AND
S28.6 Garden mounding is incorporated into carparking areas
adjacent to frontages;
AND
S28.7 Surface and subsurface drainage swales are used to
maximise stormwater infiltration;
CHRISTIAN BROTHERS – FLEXIBLE LEARNING CENTRE, SUNSHINE BEACH 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Code Assessment Tables.pdfRelated documentApplication case desk ↗
About this file
- File size
- 532 KB (small file)
- File type
No other editions are linked here.