Civil Engineering Report_Issue C · MCU21/0175

of 61

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 28 July 2021



5         STORMWATER
The stormwater related aspects of the proposed development are detailed in the Stormwater
Management Plan prepared under separate cover.


6         EROSION AND SEDIMENT CONTROL
All erosion and sediment control devices will be designed and implemented in accordance IECA
guidelines and best practice engineering principles. Further detail on Erosion and Sediment Control
techniques and measures is contained within the Stormwater Management Plan prepared under
separate cover.


7         WATER SUPPLY
Review of the water network from the survey shows the following services:

     •    An existing reticulation water main runs along the internal road verge, in the easement, to
          the North-West boundary of the proposed development.

A new connection from the existing water main located in the easement to the North-West will be
constructed. The size of the proposed water service and exact location will be determined in
consultation with the hydraulic consultant and Unitywater during the detailed design stage of the
development.

The existing and proposed water infrastructure in the vicinity of the site is shown on MPN Plan
8293-CP.1.01 attached in Appendix 3.


8         SEWER
Review of the sewer network from survey shows the following:

     •    An existing rising main collects flow from the Noosa Emporium and Noosa Civic shopping
          centre and conveys sewerage within the easement located to the North-West of the
          development site.
     •    An existing gravity sewer main exists within the car parking access road of the existing
          Emporium showrooms to the North-West. It is proposed that this sewer will be extended
          and used as the sewer connection for this development.

The proposed sewer is shown on MPN Plan 8293-CP.1.01 attached in Appendix 3. The depth and
location of the proposed sewer connection will be determined in consultation with the hydraulic
consultant and Unitywater during the detailed design stage of the development.




 Excellence with Economy in Engineering                                                                 8
 l:\8000-8999\8200-8299\8293\reports\28-07-21 civil engineering report_issue c.docx

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Civil Engineering Report_Issue C.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.