SUSPERSEDED - Minor Change Existing Approval OPW18 0342.01
Officer: Amanda Turner Direct Telephone: 07 5329 6287 Our Reference: OPW18/0342.01 Your Reference: 18-001942 17 December 2021 Bluecare C/- Calibre Consulting PO Box 997 BUDDINA QLD 4575 [email protected] Dear Sir/Madam Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 16 September 2021, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: OPW18/0342.01 Street address: 1 Grasstree Ct Sunrise Beach Qld 45671 Real property description: Lot 9 SP 252905 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 8 July 2019. Development Permit for Operational Works - Clearing Vegetation under planning scheme and Earthworks In relation to the request to make a minor change to the existing approval, Council on 17 December 2021, decided to approve the requested changes. The changes are detailed below. A. Approve the change. B. Amend condition 1. Include additional condition 48. currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS AND DOCUMENTS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 4001-100 A Bulk Earthworks Application prepared by Calibre 8 April 2019 4001-101 A Overall Layout Plan prepared by Calibre 8 April 2019 4001-102 A Survey Setout Plan prepared by Calibre 8 April 2019 4001-103 A Survey Setout Tables prepared by Calibre 8 April 2019 4001-104 A Tree Retention and Clearing Plan prepared by Calibre 8 April 2019 4001-108 A Bulk Earthworks Layout Plan prepared by Calibre 8 April 2019 4001-109 A Bulk Earthworks Typical Sections prepared by Calibre 8 April 2019 4001-110 A Bulk Earthworks Layout Plan Sheet 1 of 4 prepared by Calibre 8 April 2019 4001-111 A Bulk Earthworks Layout Plan Sheet 2 of 4 prepared by Calibre 8 April 2019 4001-112 A Bulk Earthworks Layout Plan Sheet 3 of 4 prepared by Calibre 8 April 2019 4001-113 A Bulk Earthworks Layout Plan Sheet 4 of 4 prepared by Calibre 8 April 2019 4001-114 A Road 1 Longitudinal Section prepared by Calibre 8 April 2019 4001-115 A Road 2 Longitudinal Section Sheet 1 of 2 prepared by Calibre 8 April 2019 4001-116 A Road 2 Longitudinal Section Sheet 2 of 2 prepared by Calibre 8 April 2019 4001-117 A Driveway 2 Longitudinal Section prepared by Calibre 8 April 2019 4001-118 A Retaining Wall Setout Plan prepared by Calibre 8 April 2019 4001-119 A Retaining Wall Typical Details prepared by Calibre 8 April 2019 4001-120 A Fire Trail Cross Sections prepared by Calibre 8 April 2019 N/A C Bushfire Hazard Assessment and Management Plan prepared Meridian Urban 20 March 2019 N/A 5 Ecological Management Plan Stage 2 – Lot 9 prepared by Gondwana Ecology Group P/L 1 July 2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 8 July 2021, unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS A copy of the Ecological Management Plan must be kept on the project site and incorporated into the site-based environmental/construction management plans. Local residents with 500m of the works, local schools along Ben Lexen Drive, the church at No 6 Grasstree Court and the Grasstree Court shop holders must be notified of the approved clearing works a minimum of 5 business days prior to clearing works commencing. The works must be carried out in accordance with the recommendations contained in the Geotechnical Investigation, Report No. 18248-002-Rev 1 dated 3 April 2019 prepared by Tectonic Geotechnical & Environmental Engineers PRIOR TO COMMENCEMENT OF WORKS Engineering Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer to Retention of Existing Trees Conditions) All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe pedestrian access across the frontage of the work site both during daily construction and after daily construction has ceased Proposed fencing to the work site during the construction phase of the development Adequate parking arrangements for construction workers No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Works programme identifying key components of the works and their respective durations A mailbox drop to local residencies, businesses, schools etc to advise of expected traffic movements and works hours Establishment of a communication protocol with the general public, adjoining owners, emergency services, local businesses and schools to advise of agreed construction times, impacts on traffic and services and other relevant issues identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice The relevant conditions of the higher order Material Change of Use approval viz. 132008.1128.02 to which this approval relates All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Fauna Management A qualified person* must be engaged to manage fauna prior and during clearing to: Ensure works are carried out in accordance with the Vegetation and Fauna Management Plan within the approved Ecological Management Plan and the Nature Conservation Act 1992. Undertake pre-clearing inspections including fauna relocation and removal or blocking of all vacant hollows. Ensure clearing works avoids nesting times of animals and birds. Co-ordinate staging and sequence of clearing with fauna protection. Protect and recover fauna during clearing operations (not previously removed). Manage the translocation of animals and recovery procedures in accordance with relevant legislation. *(Refer to Advisory Note) VEGETATION PROTECTION Retention of Existing Vegetation All trees and vegetation identified for retention must be protected in accordance with AS 4970, Protection of trees on development sites. Cockatoo Food Trees identified for protection must be marked out on site prior to the pre-start meeting. All tree retention, vegetation protection works and rehabilitation works must be carried out in accordance with methodology and recommendations within the Ecological Management Plan listed within this Decision Notice. Vegetation areas for protection must: Be protected in accordance with the approved Ecological Management Plan. Be protected with a 1.8m high temporary safety fence or temporary barrier mesh / three-strand wire with pickets at 3m centres, allowing for safe fauna passage. Have the fence installed and maintained for the entire period of construction. Have ‘Exclusion Zone’ signage fixed to the fence at 10m centres. Have no construction material, equipment or personnel entering the Open Space areas to the south and west of the site, unless in accordance with express written permission of the landholders. Removal of Existing Trees and Vegetation Vegetation clearing and preparation for transport to receiving site must: Be in accordance with the approved Ecological Management Plan Have all pest plants identified, treated and excluded from entering the receiving site Retain old growth tree hollows and suitably relocate and distribute for nesting fauna. Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m separation between piles. Allow for existing endemic ground flora to be translocated to suitable landscaping and rehabilitation areas. Conclude with the area being stabilised against erosion, landscaped, rehabilitated and revegetated. Rehabilitation of cleared areas on Lot 9 must: Be undertaken immediately following completion of the works that required the clearing. Result in the area being stable. Bushfire A qualified person* must be engaged for the duration of the works to ensure: Works are carried out in accordance with the approved Bushfire Hazard Assessment and Management Plan. Prior to the commencement of use, written certification is provided to Council documenting the compliance with the approved Bushfire Hazard Assessment and Management Plan. Land Rehabilitation Rehabilitation works on the receiving site must be supervised, undertaken and certified by qualified persons*. All works must be completed in accordance with this Decision Notice. *(Refer to Advisory Notes) Prior to requesting a prestart meeting, a bank guarantee of $20,000 must be lodged with Council as security for the compliance with the Ecological Management Plan listed in this Decision Notice. The guarantee: may be drawn upon by Council if: the recommendations of the Ecological Management Plan report are not implemented and, any trees identified for retention are damaged to the point where they cannot be saved will be returned upon receiving certification from the restoration ecologist the works in the Ecological Management Plan referenced within this Decision Notice have been completed as scheduled, with; 50% returned at the commencement of ‘On-Maintenance”. 10% will be returned after successful completion of each successive 12 month period. The establishment of the receiving site must occur no later than 12 months and on-maintenance achieved no later than 18 months after the clearing occurs on Lot 9. The Rehabilitation supervisor must annually: Organise formal inspection with Council’s delegate*. Submit to Council (with each inspection request) a Rehabilitation Status Report (written and photographic), mapping: The condition of the rehabilitation area. Detailing works undertaken in the previous year. The percentage cover of indigenous recruitment. Measuring the works against the Performance Criteria in the Ecological Management Plan. *(Refer to Advisory Notes) Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing the Plan of Survey. Fall protection must be provided to retaining walls that are over 1m high Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Environment Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Erosion and sediment control and windblown dust measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium- to long-term (refer to E&SC Advisory Notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by wind, sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Limit soil exposure to the area of current works and any exposed soil must be effectively stabilised without delay and prior to predicted rainfall occurring. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL ACCEPTING THE WORKS Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Bonds Bonds must: meet the requirements of council’s relevant Planning Scheme Policy for performance and uncompleted works. be calculated using a schedule of works and relevant bond equation have approval of the bond calculations and amount from Council prior to lodgement be lodged with Council and accompanied by the Bond Administration Fee/s. be requested for release by writing to Council, when relevant approval requirements have been met. On Maintenance Maintenance periods* must be: 60 months for Rehabilitation of the area described in the Ecological Management Plan *(Refer to Advisory Note) Prior to requesting an On Maintenance inspection, the following information package (prepared by respective qualified persons* and certifying compliance with approvals) must be submitted to Council: Rehabilitation certification. Fauna Report documenting the findings and outcome of the fauna protection works undertaken. On Maintenance management includes: Establishing and maintaining the works in accordance with the intent and requirements of all approvals. Rectification of works failing ‘on ground’ to a solution that still meets approval intents. Replacement of dead or poorly performing plants. A minimum period of 60 months after the Rehabilitation works are accepted on–maintenance. Annual and/or Off Maintenance Prior to requesting an Annual and/or Off Maintenance inspection the following must be provided: Written request of bond release. Annual and/or Off Maintenance Inspection must be requested: By contacting Council.* Only after lodgement of a completed the Ecological Management Plan Checklist and all other required certification and documentation. Only after all works are confirmed in good order. *(Refer to Advisory Note) Vegetation clearing on Lot 9 SP 252905 cannot commence until: Lot 6 has been cleared of vegetation and live soil (topsoil, subsoil and seed bank) has been transferred to the receiving site, with the receiving site stage 1 weed control, planting and irrigation installation completed (as detailed within section 2. Site Treatment and Transfer Methods pg. 24 of the approved OPW18/0341.01 Environmental Management Plan Stage 1 – Lot 6 revision 4 prepared by Gondwana Ecology Group P/L dated February 2021; and Written notice has been provided to Council that Civil works on Lot 9 SP 252905 will commence within three (3) months following the commencement of clearing unless otherwise agreed in writing by Council. referral agencies Not applicable. advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the final inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for the final inspection, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability, Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. Qualified Person Qualified Person, for the purpose of: Undertaking rehabilitation construction and establishment works and certifying the works is considered to be a person with five years current experience in revegetation and regeneration. Managing Fauna protection, preparing Fauna reporting and certification and calculating compensatory habitat, is considered to be an Ecologist or Environmental Scientist with a minimum of three years current experience in the field of fauna assessment and management. On Maintenance Request for On Maintenance is the responsibility of the developer. No credit will be given due to failure to request inspection. Maintenance works are the responsibility of the developer and must include regular inspections, repairs, rectifications and establishment. A single maintenance run immediately prior to inspection is not acceptable. Off Maintenance A re-inspection fee in accordance with Councils Fees and Charge Register will be charged where: A Council inspection reveals works do not comply with approval requirements. Submitted certification falsely states works comply with approval requirements. All tree retention, vegetation protection works and rehabilitation works must be carried out in accordance with methodology and recommendations within the Ecological Management Plan listed within this Decision Notice. Unexploded Ordinance As a result of military training and live firing undertaken by Australian and Allied forces there are many areas throughout Australia not controlled by the Commonwealth, which may be subject to residual Unexploded Ordnance (UXO) contamination. In accordance with the Commonwealth Policy, the Department of Defence has undertaken to identify and record sites where there is potential for such contamination. Further information can be found at http://www.defence.gov.au/UXO/ Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. property notes Not applicable. variation approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Landscaping, Civil Works submissions Not applicable. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Amanda Turner Senior Environment Officer Enc: Appeal Rights Approved Documents cc. Unitwater DECISION NOTICE HISTORY Original Decision Notice – 8 July 2019. Decision Notice - Minor – OPW18/0342.01 – 17 December 2021, with an amendment to conditions 1 and additional condition 47. Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 4 of 4 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.